Mr. Mike Huggins
<br /> February 9,2009 Groundwater Monitoring Plan
<br /> Page 8 of 8 Granite Construction Company, Vernalis Plant
<br /> Figure 14 General Mineral Constituent Concentrations in the Brown's New Well,Granite Vernalis
<br /> Plant Area, San Joaquin County
<br /> Figure 15 General Mineral Constituent Concentrations in the Brown's#1 Well,Granite Vernalis
<br /> Plant Area, San Joaquin Com=fy
<br /> Figure 16 General Mineral Constituent Concentrations.in the Granite#3 Well,Granite Vernalis
<br /> Plant Area, San Joaquin County
<br /> Figure 17 Schoeller Diagram,Mean Concentrations,Granite Vernalis Plant Area, San Joaquin
<br /> County
<br /> Figure 18 Nitrate Concentrations in Network Wells,Granite Vernalis Plant Area, San Joaquin
<br /> County i
<br /> Figure 19 Proposed Well Network for Long-Term Groundwater Level Monitoring, Granite Vernalis
<br /> Plant Area, San Joaquin County ;
<br /> Figure 20 Proposed Well Network for Long-Tenn Groundwater Quality Monitoring, Granite
<br /> Vernalis Plant Area, San Joaquin County ]
<br /> Attachments
<br /> Attachment 1 San Joaquin Valley Groundwater Basin,Tracy Subbasin(5-22.15)
<br /> Attachment 2 Depth to Groundwater.Measurements and Calculated Water Level Elevations
<br /> Attachment 3 = Contours of Equal Groundwater EIevation, 1958 and 1970
<br /> Attachment 4 Groundwater Quality Record
<br /> References
<br /> California Department of Water Resources. 2005. California Water Plan— Update 2005. Bulletin
<br /> 160-05. December 2005.
<br /> California Department of Water Resources. 2003. California's Groundwater. Bulletin 118—Update
<br /> 2003. October 2003.
<br /> Camp Dresser and McKee. 2001. Water Management Plan Phase I —Planning,Analysis and Strategy,
<br /> Volume 1. October 2001.
<br /> Granite Construction Company. 2006. Report of Waste Discharge(RWD)Application for Granite t
<br /> Construction Company, Vernalis Plant. September 2006. k
<br /> Hotchkiss W.R.and Balding G.O. 1971. Geology, Hydrology, and Water Quality of the Tracy-Dos
<br /> Palos Area, San Joaquin Valley, California. Open-Fiie report-U.S. Department of the Interior.
<br /> Geological Survey. Water Resources Division.
<br /> Luhdorff and Scalmanini, Consulting Engineers. 2005. Assessment ofHydrogeologic Conditions and
<br /> Potential Impacts of the Proposed Surface Mining Plan, Teichert Aggregates" Vernalis West and
<br /> East Aggregate Mining Project Site, San Joaquin County. Nov-16-2005.
<br /> Luhdorff and Scalmanini, Consulting Engineers. 2006. Background Groundwater Quality Study,
<br /> Teichert Aggregates'Esparto Facility, Yolo County, CA. Mar-4-2006.
<br /> Luhdorff and Scalmanini, Consulting Engineers. 2008a. Groundwater Conditions in the Vicinity ofa
<br /> the Esparto Plant Site, 2008, Yolo County. Oct-9-2008.
<br /> Luhdorff and Scalmanini, Consulting Engineers. 2008b. Annual and 4th Quarter 2008 Monitoring
<br /> Report for the Syar Industries—Madison Plant, Yolo County, CA. Dec-1-2008.
<br /> Luhdorff and Scalmanini, Consulting Engineers. 2009. Annual and Fourth Quarter 2008 Report
<br /> of Groundwater Monitoring Results, Teichert Aggregate's Esparta Plant, Yolo County, CA.
<br /> Jan-6-2009.
<br /> Northeastern San Joaquin County Groundwater Banking Authority. 2004. Eastern San Joaquin County
<br /> Groundwater Basin, Groundwater Management Plan, September 2004.
<br /> San Joaquin County. 2005. Revisions gfApproval for Quarry Excavation Application QX-94-1 of
<br /> Granite Construction Company(APN: 20-5-120-06, 16; 265-080-11, 12, 15; 37282 S. Bird Root],
<br /> Tracy). Feb-9-2005 letter from Kevin Swanson(Assistant Planner, San Joaquin County
<br /> Community Development Department).
<br /> © LUHDORFF 6 SCALMANINI
<br /> C O N S O I- T I N G ENGINEERS
<br />
|