Laserfiche WebLink
�} Blossom Road Subdivision Page 8 of 9 <br /> Our Project Number: LGS080511 <br /> April 30, 2008 <br /> 1/7A CONCLUSIONS <br /> In summary, percolation rates that meet the minimum EHD standards were achieved in the <br /> proposed septic disposal areas of each of the proposed parcels. The parcels appear suitable for <br /> the use of a standard septic system utilizing leach lines or a filter bed. <br /> Groundwater was encountered at approximately six (6) feet on site. The on-site water well was <br /> tested for nitrate and DSCP. The results of this analysis will be forthcoming. <br /> /8.0 LIMITATIONS <br /> The conclusions of this report are based on the information provided regarding the existing and <br /> proposed development, the use of the subject property, and the site conditions as they existed <br /> at the time we excavated our test holes and performed the percolation tests. It was assumed <br /> that the test holes and percolation test results are representative of the subsurface conditions in <br /> the general area. <br /> Our professional services were performed, our findings obtained, and our conclusions proposed <br /> in accordance with generally accepted engineering principles and practices. This warranty is in <br /> lieu of all other warranties either expressed or implied. Test findings and statements of <br /> professional opinion do not constitute a guarantee or warranty, expressed or implied. <br /> 902 Industrial Way•Lodi,CA 95240•209.367.3701 •Fax 209.369.4228 ®2008 Neil O.Anderson&Associates,Inc <br />