My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005926
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BORBA
>
8707
>
2600 - Land Use Program
>
PA-0600010
>
SU0005926
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 2:30:16 PM
Creation date
9/4/2019 10:31:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005926
PE
2656
FACILITY_NAME
PA-0600010
STREET_NUMBER
8707
Direction
S
STREET_NAME
BORBA
STREET_TYPE
RD
City
STOCKTON
Zip
95206-
APN
16208002
ENTERED_DATE
2/22/2006 12:00:00 AM
SITE_LOCATION
8707 S BORBA RD
RECEIVED_DATE
1/4/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\B\BORBA\8707\PA-0600010\SU0005926\APPL.PDF \MIGRATIONS\B\BORBA\8707\PA-0600010\SU0005926\CDD OK.PDF \MIGRATIONS\B\BORBA\8707\PA-0600010\SU0005926\EH COND.PDF \MIGRATIONS\B\BORBA\8707\PA-0600010\SU0005926\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br /> Electric Company <br /> 8 . Streets and Roads : Access to facilities must be maintained at all times . Street lights may be <br /> allowed in the fee strip ( s) and /or easement ( s ) but in all cases must be reviewed by PG & E for <br /> proper clearance . Roads and utilities should cross the transmission easement as nearly at right <br /> angles as possible . Road intersections will not be allowed within the transmission easement . <br /> 9 . Pipelines : Pipelines may be allowed provided crossings are held to a minimum and to be as <br /> nearly perpendicular as possible . Pipelines within 25 feet of PG & E structures require review by <br /> PG & E . Sprinklers systems may be allowed ; subject to review . Leach fields and septic tanks are <br /> not allowed . Construction plans must be submitted to PG & E for review and approval prior to the <br /> commencement of any construction . <br /> 10 . Signs : Signs are not allowed except in rare cases subject to individual review by PG & E . <br /> 11 . Recreation Areas : Playgrounds , parks , tennis courts , basketball courts , barbecue and light <br /> trucks ( pickups , vans , etc . ) may be allowed ; subject to review of plans . Heavy equipment <br /> access to PG & E facilities is to be maintained at all times . Parking is to clear PG & E structures by <br /> at least 10 feet . Protection of PG & E facilities from vehicular traffic is to be provided at <br /> developer' s expense AND to PG & E specifications . <br /> 12 . Construction Activity : Since construction activity will take place near PG & E ' s overhead <br /> electric lines , please be advised it is the contractor' s responsibility to be aware of, and observe <br /> the minimum clearances foreboth workers and equipment operating near high voltage electric <br /> lines set out in the High -Voltage Electrical Safety Orders of the California Division of Industrial <br /> Safety ( https : //www . dir . ca . gov /Title8 / sb5g2 . html) , as well as any other safety regulations . <br /> Contractors shall comply with California Public Utilities Commission General Order 95 <br /> ( http : //www . cpuc . ca . gov/gos/GO95 /go 95 startup page . html) and all other safety rules . No <br /> construction may occur within 25 feet of PG & E ' s towers . All excavation activities may only <br /> commence after 811 protocols has been followed . <br /> Contractor shall ensure the protection of PG & E ' s towers and poles from vehicular damage by <br /> ( installing protective barriers ) Plans for protection barriers must be approved by PG & E prior to <br /> construction . <br /> 13 . PG & E is also the owner of distribution facilities throughout many of the areas within the <br /> state of California . Therefore , any plans that impact PG & E ' s facilities must be reviewed and <br /> approved by PG & E ito ensure that no impact occurs that may endanger the safe and reliable <br /> operation of its facilities . <br /> PG & E Gas and Electric Facilities Page 6 <br /> Public <br />
The URL can be used to link to this page
Your browser does not support the video tag.