Laserfiche WebLink
d <br /> APPLICATION - AGRICULTURAL EXCAVATION <br /> N; <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> ., FILE NUMBER: PA- <br /> RECLAMATION PLAN <br /> CHECKLIST-CONTINUIEP <br /> B. Reclamation Schedule. <br /> 4 [X) 1. Provide a time schedule that will ensure reclamatiM at the earliest possible time on those portions of the mined <br /> i lands that will not be subject to further disturbance. <br /> (Xj 2. Provide a map of the proposed phases of reclamation and the corresponding acreage and dates for completion of <br /> each phase. <br /> [X] 3. If reclamation will not be concurrent with mining,explain why. <br /> C. Post Mining Topography: <br /> [X] 1. Provide a map of proposed post-reclamation topography;show drainage plan,benches, roads,plantings,and other <br /> pertinent features of the reclamation. <br /> [X] 2. Attach cross sections through slopes,cuts,and fills;show original ground,post-mining surface,underlying geologic <br /> conditions,and reclaimed surface. <br /> [X] 3. Describe how slopes will be stabilized to prevent failuresAandslides,earth flows,falling rock,and erosion. <br /> ( ] 4. Specify slope design calculations including the factor of safety- <br /> [ ] D. Impoundments: Describe how impoundments will be reclaimed(e.g., regraded,dewatered,capped,revegetated, <br /> removed,etc.). <br /> [X] E. Drainage: Describe provisions for natural drainage and how erosion of disturbed land and sedimentation will be <br /> E controlled during excavation and after final reclamation(e.g.,revegetation,rip rap,sedimentation basins,berms,ditches, <br /> water bars,silt screens regrading,etc.). <br /> [Xj F. Disposition of Old Equipment: Discuss the disposition of equipment, buildings,structures,etc. <br /> G. Reve,etation: <br /> [X] 'I. Explain topsoil(or soil substitute)redistribution methods, including volumes of materials to be redistributed, <br /> equipment and methods for transport;methods for preventing over compaction,and schedule for replacement. The <br /> explanation may include: <br /> [ ] a. The average thickness of replaced topsoll on the mine site. <br /> [ ] b. Tests that will be run to determine whether soil or mine wastes need soil amendments to promote the support <br /> i <br /> plant growth. <br /> [ ) c. Methods to be used to protect redistributed topsoil(or soil substitute)from wind and water erosion before and <br /> after seeding and planting. <br /> [ ] 2. Explain the types and amounts of fertilizers,mulch,soil stabilizers,lime,or other materials that will be used in <br /> revegetation and indicate when they will be applied. <br /> [ ] 3. Provide a planting plan. The plan may include: <br /> [ ] a. How the site will be prepared for planting (e.g.,ripping,disking,and incorporation of soil additives). <br /> [ ] b. A list of the species(include scientific names)to be planted. <br /> [ ] c. The type of plant material to be used(e.g.,seeds,cuttings,container,plugs). <br /> a <br /> FXEVS WlanningApplication Formsl Page 11 of 15 <br /> Agricultural Excavation.doc.(Revised 02-03-10) <br />