My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012817
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BOWMAN
>
360
>
2600 - Land Use Program
>
QX-01-01
>
SU0012817
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 1:35:37 PM
Creation date
9/4/2019 10:33:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012817
PE
2605
FACILITY_NAME
QX-01-01
STREET_NUMBER
360
Direction
W
STREET_NAME
BOWMAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-
APN
193-260-22
ENTERED_DATE
1/9/2020 12:00:00 AM
SITE_LOCATION
360 W BOWMAN RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\B\BOWMAN\360\QX-01-01\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y <br /> IMPROVEMENT°PLAN SUBMITTAL CHECKLIST <br /> fallowin items must be submitted to the Public Works Department before <br /> A. The g <br /> the Improvement Plans can be checked: <br /> 1. Preliminary Engineer's estimate. <br /> 2. Plan check fee based on the preliminary Engineer's estimate (excluding <br /> contingencies): <br /> a. 5.5% for the first $25,000.00 <br /> b. Plus 3% for the next $225,000.00 <br /> c. Plus 1.75% over $250,000.00 <br /> 3. 4-complete sets of improvement Plans (blueline) <br /> 4. 4-sets of Specification books <br /> 5. 1-complete set.of Preliminary Soils Report including R-values and <br /> structural section calculations. <br /> 6. Storm drain calculations (Hydrology, <br /> sub-area map, pipe line, hydraulic <br /> design, ponding basin, pump system, etc., if applicable). <br /> 7, Water and sanitary sewer design data and calculations if applicable. <br /> g, 1-Draft Final Map <br /> B. Field. Inspection fee based-on approved Engineer's estimate (excluding <br /> contingencies): <br /> 1. 4.00% first $200,000.00 <br /> o $500,000.00 <br /> 2. Plus 3.00% over $200,000.04 fo $1,000,000 <br /> 00 <br /> 3. Plus 2.50% over $500,00 <br /> 4. Plus 2.00% over $1,000,000.00 <br /> PLANCHEK6196 <br />
The URL can be used to link to this page
Your browser does not support the video tag.