Laserfiche WebLink
E <br /> I ENVIRONMENTAL HEALTH`DEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> Unit Supervisors <br /> Q , ,.::?N•� <br /> Donna K.Heran,R.E.H.S. 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.s. <br /> Director Mike Huggins,R.E.H.S.,R.D.I. <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Douglas W.Wilson,R.E.H.S. <br /> • �`. Y "P Manager Program M <br /> Pro <br /> g � Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> r F o e Laurie A.Cotulla,R.E.H.S. Robert McClellon,R.E.H.S. <br /> Program Manager Fax: (209} 464-013$ <br /> Mark Barcellos,R.E.H.S. <br /> June 27,2002 <br /> TO: San Joaquin County <br /> Community Development Department <br /> FROM: San Joaquin County <br /> Environmental Health Department <br /> CONTACT PERSON: Raymond Borges,Lead Senior R.E.H.S., R.D.I. <br /> PHONE NUMBER: (209)468-3284 <br /> RE: PA-02-237 (SA),Attention: Jennifer Jolley <br /> 2900 North Bozzano Road (Private Road), Stockton <br />!k The San Joaquin County Development Title Requirements listed below have been identified as <br /> pertinent to this project. Other requirements may also apply. These requirements cannot be <br /> modified. <br /> A. Environmental Health Department requires a sail suitability study incorporating proposed <br /> number of employees and customers, indicating that the area is suitable for septic tank usage. <br /> This must be performed prior to issuance of a building permit(s)-(San Joaquin County <br /> Development Title, Section 9-1105.2(d)). A review fee of$178.00 must be paid at time of <br /> submittal to Environmental Health Department. <br /> The sewage disposal system shall comply with the on site sewage standards of San Joaquin <br /> County prior to approval. A percolation test that meets absorption rates of the manual of <br /> septic tank practice or E.P.A. Design Manual for onsite wastewater treatment and disposal <br /> system is required for each parcel. A permit fee of$89.00 per percolation hole is required. <br /> I <br /> B. State on revised site plans the maximum number of employees and customers the sewage <br /> disposal system is being designed for. In addition, show on revised plans that the leach field <br /> area will be barricaded so it cannot be driven over,parked on, or used as a storage area. This <br /> leach field area must be used for that specific purpose only, and it cannot contain any <br /> underground utility lines (San Joaquin County Development Title, Section 9-1110.4(c)(5)). <br /> C. Construction of individual sewage-disposal-system(s) under permit and inspection by the <br /> Environmental Health Department is required at the time of development based on the Soil <br /> Suitability Study findings (San Joaquin County Development Title, Section 9-1110.3 & 9- <br /> 1110.4). <br /> Page 1 of 2 � <br /> r <br />