Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> PA-0200237 <br /> 2. The Water Supply Facilities Impact Mitigation Fee will be required for this development. The <br /> fee is due and payable prior to issuance of the building permit. (The fee currently is $490.00 per <br /> 1,000 gross square foot of building designated as Service Commercial. The fee shall be <br /> automatically increased on January 1 of each year through the year 2005 at the rate of 7.66 <br /> percent. A credit may be allowed if it can be verified that the existing development on this site <br /> was in operation on or after April 30, 1991.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 4. Verification shall be obtained from the Solid Waste Division (468-3066) that this development <br /> has met the requirements of the Waste Plan Format for Development Projects. Final Site Plan is <br /> required upon submittal of verification. <br /> GK:BN:sh <br /> t <br />