Laserfiche WebLink
SAN JOAQLQVALLEY UNIFIED AIR POLLUTIQ CONTROL DISTRICT <br /> Compliance Assistance Bulletin- December, 1994 <br /> Asbestos Synopsis <br /> Definitions-Contin ued <br /> Regulated Asbestos-Containing (1) Friable asbestos-containing material (ACM). <br /> Materials IRACM)Include: (2)Category 1 nonfriable ACM in poor condition and"f as be-_Dme friable"or that has or <br /> will be subjected to sanding,grinding,cutting, or abrading. <br /> (3)Category 11.nonfriable ACM that has a high probability of Lecoming,or as become, <br /> crumbled,pulverized,or reduced to powder by the forces ex-,ected to act on the material <br /> in the course of demolition or renovation. <br /> Friable Asbestos-Containing Any material containing more than 1 percent asbestos. as c-'=rm ned by Polarized Light <br /> Material(A(M)- Microscopy(PLM)testing,which,when dry,can be crumble Dulverized.or reduced to. <br /> powder by hand pressure. <br /> Category t nonfriable ACM: Any asbestos-containing packings,gaskets, resilient floor cc-.erings, and asphalt roofing <br /> products containing more than 1 percent asbestos as deterrr~ed by PLM testing. <br /> Category 11 nonfriable ACM: Any asbestos-containing materials,excluding Category 1 ACf.1. containing more than 1 <br /> percent asbestos as determined by PLM testing,which when dry,cannot be crumbled. <br /> pulverized,or reduced to powder by hand pressure. <br /> hlspeci :done by,or under the direction of a Cal-OSHA certified consultant prior to: <br /> • Any regulated demolition. <br /> • Any renovation activity in which more than 160 sq.ti.of any building material or 260 linear feet of pipe insulation wifl be disturbed. <br /> An inspection is not required if the material to be disturbed is stipulated to be asbestos-containing and will be removed in <br /> accordance with the NESHAP. <br /> (nsp�ctiQaHeRQd�+ls+�t_lnciu cte: <br /> • A schematic showing the location of all tested materials. <br /> • The following data for all asbestos-containing materials: <br /> 1.The amount and description o1 each material. <br /> 2. Percent asbestos content. <br /> 3.Whether or not the material is friable. <br /> Notification: An asbestos notification must be submitted to the District at least 10 working days prior tc: <br /> 1.Any regulated demolition. <br /> 2.Any renovation in which more than 160 sq,it.or 260 linear ft.of RACM will be disturbed. <br /> A copy of the Asbestos Inspection Report must be included with fi+P Notification. <br /> Notification will not be considered complete,nor will the 10 working day notice period begin until all reqs•ed 'information and fees <br /> have been submitted to the District. <br /> Fou: District Rule 3050 requires that nonrefundable asbestos fees be received along with asbestos job notifications. Fees must <br /> be paid for regulated asbestos abatement projects and regulated demolition projects,whether or not asbestosis present <br /> The California Health and Safety Code requires that the city or county building official have proof of <br /> compliance with,or exemption from,the asbestos notification requirement before he or she issues a demolition permit. <br /> After the District has received a demolition notification and is satisfied that the NESHAP notification requirements have been <br /> complied with,the District will issue a Demolition Release Form to the person who submitted the notification. <br /> Recycle and Waste Disposal:The asbestos notification must also identify any building materials whici7:vill be recycled after <br /> removal from a project. The name of the recycling contractor and location of such activity must be identi`ied. <br />