Laserfiche WebLink
April 20, 2004 <br /> NOA Project Number: E04002A <br /> Page 13 - - <br /> L <br /> 8.0 CONCLUSIONS AND RECOMMENDATIONS <br /> Fjv A satisfactory percolation rate was achieved on the parcel. The soils are suitable for a septic <br /> system with leach lines and seepage pits. The nitrate loading balance was performed based on.the <br /> assumptions used in this report and the assumptions-of the Hantzshe &Finnemore equation. The <br /> F-i analysis indicates that uses associated with the proposed project will not cause a long term <br /> buildup of nitrates above 10 mg/L--N in the ground water. Our.recommendations for the project <br /> are as follows: <br /> r <br /> Follow the San-Joaquin County Sewage Standards where required. <br /> 9.0 LIMITATIONS - <br /> Our professional services were performed;our findings obtained,- and our conclusions proposed <br /> in.accordance with generally accepted`engineering principles and practices. This warranty is in <br /> lieu of all other warranties either expressed or implied. Test findings and statements of <br /> professional opinion do not constitute a guarantee or warranty, expressed or implied. <br /> Best Regards; <br /> NEIL O. ANDERSON&ASSOC.,-INC. <br /> Abi a�co B.A. <br /> g - <br /> riProject Manager <br /> F11David J. Welch, M.Sc., Senior Geologist <br /> CEG-2151, CHG-653" .. _ <br /> Q3. <br /> p� No. 2151 0� D <br /> CERTRER a <br /> ENGINEERING <br /> �s� GEOLOGIST- ��- . <br />