My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012821
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BRANDT
>
13751
>
2600 - Land Use Program
>
SU-91-15
>
SU0012821
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 5:16:09 PM
Creation date
9/4/2019 10:36:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012821
PE
2611
FACILITY_NAME
SU-91-15
STREET_NUMBER
13751
Direction
E
STREET_NAME
BRANDT
STREET_TYPE
RD
City
LOCKEFORD
Zip
95237-
APN
01906029
ENTERED_DATE
1/9/2020 12:00:00 AM
SITE_LOCATION
13751 E BRANDT RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\B\BRANDT\13751\SU-91-15\REV SITE PLN.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 1 <br /> PC: 11-5-92 <br /> SU-91-15 <br /> 7. COUNTY PARKS AND RECREATION: <br /> a. The developer shall comply with Section 9-1230.2 of the Development Title prior to <br /> approval of the Final Map. <br /> 8: MOKELUMNE FIRE DEPARTMENT: <br /> a. The project shall conform with applicable Uniform l=ire Code standards. <br /> b. The project shall conform with applicable National Fire Protection Association standards. <br /> C. The project shall conform with applicable San Joaquin County Fire Sprinkler Ordinances. <br /> d. Fire Department Development Fees shall be paid in accordance with San Joaquin <br /> County's Ordinance and Resolution adopting the fee schedule. <br /> e. The installation of all fire protection equipment shall be in accordance with NFPA 24, and <br /> all fire hydrants shall meet fire department standards. <br /> f. All plans shall be checked by tate fire department, and plan check fees shall be paid prior <br /> to issuance of any permits. <br /> 9. PACIFIC GAS & ELECTRIC COMPANY: <br /> a. Ten-foot-wide public utility easements shall be dedicated along the perimeter of all streets <br /> of the subdivision. <br /> b. Any existing PG&E facilities affected by the project shall be relocated or placed <br /> underground at the owner's or developer's expense. <br /> C. There shall be no buildings, wells, swimming pools, deep rooting trees, or shrubs <br /> permitted in the 20-foot-wide gas line distribution easement that runs contiguous to the <br /> rear lots along Brandt Road. <br /> 10. CALIFORNIA DEPARTMENT OF TRANSPORTATION: <br /> a. Construct a deceleration lane/right-tum pocket on northbound State Route 12188 at the <br /> approach to the Brandt Road intersection. <br /> b. Construct a left tumPoc ket on the westbound Brandt Road approach to the State Route <br /> 12/88 intersection. <br /> e project's proportionate share contribute to a fund to signalize the State <br /> C. Based on th p l p po , <br /> Route 12/88 and Brandt Road intersection prior to approval of the Final Map. <br /> -24- <br />
The URL can be used to link to this page
Your browser does not support the video tag.