Laserfiche WebLink
. s <br /> Item No. i <br /> �r1 PC: 11-5-92 <br /> 1 SU-91-15 <br /> Page 36 <br /> MONITORING REQUIREMENTS, <br /> F7 <br /> MITIGATION MEASURES RESPONSIBLE AGENCY, & <br /> TIMING OF MONITORING <br /> CUMULATIVE TRAFFIC: Implementation (San Joaquin County <br /> Department of Public Works) <br /> 2. The applicant should be responsible for <br /> contributing fees on a pro-rata basis toward the The mitigation measure should be made a <br /> completion of the following improvements, and condition of approval of the tentative map for <br /> the County Traffic Impact Mitigation Fee the project. Additionally, the Traffic Impact <br /> Program should be adjusted to ensure that the Mitigation Fee Program should be modified by <br /> improvements will be funded: the County to cover the improvements. <br /> (a) Signalize the intersection: of State Route 12 Monitoring (San Joaquin County Department of <br /> and 88/Tully Road and add eastbound and Public Works) <br /> westbound right tum lanes. <br /> The Department of Public Works should verify <br /> (b) Signalize the intersection of State Route 12 that applicable traffic mitigation fees are paid <br /> and 88/Jack Tone Road Bypass and add an prior to issuing building permits for the project. <br /> eastbound through lane. <br /> (c) Signalize the Jack Tone Road/Brandt Road <br /> intersection. <br /> (d) Widen State Route 12 and 88 from Brandt <br /> Road to Tully Road to a four-lane facility or <br /> provide a bypass route (see Section F for State <br /> Route 12 and 88 bypass discussion). <br /> x . <br /> r <br /> a _ <br />