Laserfiche WebLink
YES NO <br /> 1. WATER: <br /> a. Is any portion of the project <br /> subject to flood hazard? x <br /> Flood zone "C" <br /> b. Will the project result in <br /> reduction of surface or ground <br /> water quality or quantity? x* <br /> C. Will the project result in <br /> increases to surface, channel <br /> or stream volumes, or alterations <br /> to drainage patterns and streams? x <br /> d. Will the project result in <br /> erosion of or sedimentation to <br /> a channel, river, or body of water? x <br /> Other sources used: <br /> 2. EARTH: <br /> a. Will the project result in or be <br /> subject to potentially hazardous <br /> geologic or soils conditions on or <br /> immediately adjoining the site (slides, <br /> .springs, erosion, liquefaction, <br /> earthquake faults; steep slopes, <br /> septic tank limitations) ? x <br /> b. Will the project involve substantial <br /> grading which could result in <br /> secondary impacts (consider amount, <br /> steepness, and visibility of proposed <br /> slopes; consider effect of grading on <br /> trees and -creek channels) ? x <br /> C. Will there be conversion of prime <br /> farmland (over 40 acres and not shown <br /> for development in the General Plan) ? x* <br /> Other sources used: <br /> Initial Study (Rev: 01/91) <br /> 3 <br />