Laserfiche WebLink
YES NO <br /> ** b. Will the project result in the � <br /> need for or the expansion of the <br /> following services: fire and police <br /> protection, schools, parks and <br /> recreation, libraries, roads, flood i <br /> control,n rol solid waste or otherP ublic <br /> works facilities, public transit, or <br /> governmental services? x* <br /> C. Will the project adversely impact <br /> existing recreational/park <br /> opportunities or require new . <br /> park/recreation opportunities? x <br /> Note: ** "Yes" answers to these two questions and 9 (b) below <br /> will require additional discussion, but do not necessarily <br /> indicate a potentially significant impact. <br /> Other sources used: <br /> i <br /> 9. Transportation/Circulation: <br /> a. Will the project generate ' <br /> significant traffic volumes and/or <br /> make a significant contribution to <br /> an existing circulation problem <br /> (consider existing LOS on nearby <br /> arterials and highways, road design, <br /> access, parking, accident potential) ? x* <br /> ** b. Will the project cause special <br /> transportation considerations <br /> (consider waterborne, rail, air, <br /> pedestrian, and bicycle traffic, <br /> and public transportation <br /> systems and parking facilities) ? x <br /> C. Will the project result in a <br /> significant increase in commuting j <br /> to and from the local community? x* <br /> d. Will the project be impacted <br /> by or interfere with an airport <br /> flight path? x <br /> e. Will the project restrict access <br /> to the surrounding area? x <br /> Other sources used (note all traffic studies) : <br /> Initial study (Rev:01/91) <br /> 6 <br /> i <br />