Laserfiche WebLink
S =, Sufficient <br /> I — Insufficient <br /> S I 6.0 PERCOLATION TEST INFORMATION SECTION <br /> �� ❑ 6.1 Site map showing the location,with concise and accurate dimensions of the percolation test holes on the parcel. <br /> 6.2 The minimum number of shallow and dee percolation tests was performed for each parcel. <br /> } � ❑ PP p <br /> ❑ 6.3 Description of the date,time and protocol used to prepare the test hole, including depth and dimensions of hole, <br /> preparation of hole, and depth of water used to presoak(minimum 12 inches). <br /> 2` ❑ 6.4 Description of the date,time and condition of the test hole after the 24-hour soak period (hole still intact, hole dry, <br /> depth to water remaining in hole,etc.) <br /> �B' ❑ 6.5 The test conformed to SJC Policy EHD 02-02(correct depth,diameter,2"gravel, 6"water refill,correct readings <br /> recorded). <br /> � `�'❑ 6.6 Complete Percolation fest Form (including readings}w�s�ovide�withi RENS v kation signature The rate <br /> was correctly calculated using the last reading." <br /> ❑ 6.7 Discussion of any potential problems predicted and/or the need for an engineered �alternatia septic system. <br /> [� ❑ 6.8 Discussion of percolation rates in relation to the type,size and location of future leach fields needed at the site. . <br /> 7.0 CONCLUSION SECTION <br /> �,�G ❑ 7.1 The report was signed and stamped by the appropriately registered individual <br /> Reviewed By: Lisa Medina, Sr. R.E.H.S: Reviewed Date: <br /> i <br /> f <br /> F <br /> i <br /> 1 <br /> j� <br /> i im 26-02-003 Page 2 of 3 Soil suitahility Checklist <br />