Laserfiche WebLink
U <br /> Kerry Sullivan. -2- <br /> COMMENTS ON DEVELOPMENTS <br /> QX-94-02 <br /> 2. The applicant shall comply with the mitigation measures identified in Traffic Study prior to <br /> approval. The Traffic Impact Mitigation Fee shall be required for this development. The fee <br /> is due and payable at the time of building permit application. (The fee currently is $159.47 <br /> per daily trip-end generated in the Lockeford area. The fee shall be automatically adjusted <br /> July I of each year by the Engineering Construction Cost Index as published by the <br /> Engineering News Record) <br /> (Resolutions 00-433) <br /> 3. The quarry operator shall participate in the repair of Brandt Road, and any other roads <br /> designated in the traffic study, or requiring mitigation due to quarry operation. The road <br /> maintenance agreement shall be amended to account for increased traffic from the 24-hour <br /> production. <br /> NOTE: All previous conditions shall still apply. <br /> GK:sh <br />