My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004657
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BRANDT
>
24717
>
2600 - Land Use Program
>
QX-94-0002
>
SU0004657
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 10:08:55 AM
Creation date
9/4/2019 10:37:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004657
PE
2656
FACILITY_NAME
QX-94-0002
STREET_NUMBER
24717
Direction
E
STREET_NAME
BRANDT
STREET_TYPE
RD
City
LODI
APN
02316002, 03 &
ENTERED_DATE
10/8/2004 12:00:00 AM
SITE_LOCATION
24717 E BRANDT RD
RECEIVED_DATE
10/7/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\B\BRANDT\24717\QX-94-02\SU0004657\MISC.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibits 4 and show cross sections of ti proposed quarry. <br /> Figure 4 is a typical cross section for the reserve area. As <br /> - shown in these cross sections, KRC will ensure that excava- <br /> tion side slopes will be no steeper than 1. 5 horizontal to 1 <br /> vertical. KRC intends to use all available overburden to <br /> _ backfill the excavation to reduce these slopes during recla- <br /> mation. All slopes will be seeded. If necessary to control <br /> erosion, additional erosion control measures will be taken. <br /> Such measures may include mulching, installation of erosion <br /> control fabric and other appropriate practices on a case by <br /> case basis. <br /> As shown on Exhibit 3 , no quarry activities will take place <br /> in any of the major drainages that are located on this <br /> property. <br /> 25. If applicant plans short-term phasing of reclamation, de- <br /> scribe in detail specific reclamation to be accomplished <br /> during first phase: <br /> Reclamation will be accomplished in phases as indicated on <br /> the Phase Map, Exhibit 6. The phases of reclamation follow <br /> _ the phases of mining, with each phase lasting approximately 5 <br /> years. For example, when mining is completed in Phase 1 and <br /> has commenced in Phase 2 , reclamation will commence in Phase <br /> 1. Reclamation in each phase will follow the procedures <br /> described under #24 above. <br /> 26. Describe how reclamation of site in this manner may affect <br /> future mining at the site and in the surrounding area: <br /> Reclamation of the site in the manner described above will <br /> have no adverse impacts upon future mining at the site and in <br /> - the surrounding area. It is anticipated that no economically <br /> recoverable sand or aggregate reserves will remain at the <br /> site following cessation of the mining operation. Thus, this <br /> site will not be a candidate for further mining. Cessation <br /> of the mining operation and reclamation of this site will not <br /> impact any off-site surrounding areas. Any future mining in <br /> the surrounding area can proceed as is economically feasible <br /> and permitted. <br /> — KRC Aggregate, Inc. <br /> - 10 - April 1, 1994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.