Laserfiche WebLink
County of San Joaquin—KRC Mine Expansion <br /> Mitigation Monitoring and Reporting Program <br /> Table 1: Mitigation Monitoring and Reporting Table <br /> Method of <br /> Mitigation Measure Verification Implementing Party Timing of Verification Monitoring Party <br /> ...... — ....._. <br /> Section 4.5—Biological Resources <br /> �_...---...... <br /> ___ <br /> MM 4.5-1a:Mitigationfor impacts to vernal pool branchiopods The applicant will Applicant Prior to ground Community <br /> 1. To determine if the vernal pools and seasonal wetlands within provide evidence to clearing,subsurface Development <br /> the RMAs and the vernal pools and seasonal wetlands located the Community earthwork and on- Department <br /> within the 250-foot buffer zones of Resource Management Development going during <br /> Areas(RMAs)and haul roads are occupied by listed vernal pool Department's construction i <br /> branchiopod species,protocol level surveys will be conducted satisfaction of this <br /> prior to initiation of mining activities. Surveys will be implementation <br /> conducted according to the Interim Survey Guidelines to measure by survey or <br /> Permittees for Recovery Permit under Section 10(a)(1)(A)of the other appropriate <br /> Endangered Species Act(ESA)for Listed Vernal Pool documentation. <br /> Branchiopods(USFWS 1996). The guidance recommends that <br /> either two full wet season surveys be conducted within a five- <br /> year period or a full wet season and a consecutive dry season(or <br /> vice versa)be conducted. Surveys will be initiated at least two <br /> years prior to the construction of haul roads or mining activities <br /> within the RMAs to allow sufficient time to complete two wet <br /> season surveys,or one wet season and one dry season survey. <br /> 2. Potential indirect impacts to vernal pool branchiopod habitat <br /> located within the 250-foot buffer zones around RMAs and haul <br /> roads would be avoided or minimized through implementation <br /> of conservation/minimization measures and Best Management <br /> Practices(BMPs)in Section 9.3.1 of the BA(ECORP <br /> Consulting,Inc.2009),and listed below,following the <br /> mitigation measures. These were designed to protect biological <br /> resources in the quarry expansion area,including protection of <br /> water quality from erosion,sedimentation,and non-point source <br /> pollution. <br /> 3. If listed vernal pool branchiopods are present;direct impacts to <br /> these occupied habitats will be mitigated at an offsite USFWS_ <br /> approved mitigation bank at a ratio of 3:1 (2:1 preservation and <br /> 1:1 creation),and indirect impacts will be mitigated at a ratio of <br /> 2:1 preservation(USFWS 1996). <br /> Michael Brandman Associates 4 <br /> H:\Client(PN-JN)\1478\14780009\9-Final EIR\IvNW\14780009 Sec01-00 NWRP.doc <br />