Laserfiche WebLink
County of San Joaquin-KRC Mine Expansion <br /> Mitigation Monitoring and Reporting Program <br /> Table 1: (cont.): Mitigation Monitoring and Reporting Table <br /> .......... ..... ......_....... _.... .... _ ........._........ <br /> Mitigation Measure Action Implementing Party Timing Monitoring Party <br /> MM 4.5-1e:Mitigation for impacts to Swainson's hawk The applicant will Applicant Prior to ground I Community <br /> I. Ground clearing and removal of vegetation shall occur outside provide evidence to clearing activities Development <br /> of the nesting season,which typically runs from March 1 the Community subsurface earthwork Department <br /> through September 1. Development ; and on-going during <br /> 2. If ground clearing or removal of vegetation must occur during <br /> Department's construction <br /> the nesting season,surveys for nesting Swainson's hawk shall satisfaction of this <br /> be conducted prior to implementation of any ground clearing implementation <br /> activities associated with excavation of each RMA including measure by survey or <br /> haul roads. Surveys shall be limited to those areas within 0.25 other appropriate <br /> mile of each excavation area where suitable habitat is present. documentation. <br /> Surveys shall be conducted no more than 30 days prior to the j <br /> beginning of ground disturbance. If an active nest is located,a <br /> qualified biologist shall determine the need(if any)for <br /> temporary restrictions on mining. <br /> j MM 4.5-1f:Mitigation for impacts to other nesting birds The applicant will Applicant Prior to ground Community <br /> 1. Removal of woody vegetation and other ground clearing provide evidence to clearing activities Development <br /> activities required to implement each phase of the project shall the Community subsurface earthwork Department <br /> occur outside of the nesting season,which generally runs from Development and on-going during <br /> March 1 through September 1. Department's construction <br /> 2. If these activities must occur during the nesting season satisfaction of this <br /> (generally March 1 through September 1),preconstruction implementation <br /> surveys for nesting birds shall be conducted within 250 feet of measure by survey or <br /> the quarry expansion area. Surveys shall be conducted no more other appropriate <br /> than 30 days prior to the beginning of ground disturbance. If an documentation. <br /> active nest is located,a qualified biologist shall determine the <br /> need(if any)for temporary restrictions on mining. The <br /> monitoring biologist will determine the necessary minimum <br /> setback based on the species of bird that is nesting. <br /> Construction activity may be allowed within the minimum <br /> setback area at the discretion of the monitoring biologist. <br /> Michael Brandman Associates 9 <br /> H:\Client(PN-.IN)\1478\14780009\9-Final EIRVV NW\14780009_Sec01.00 MMRP.doc <br />