Laserfiche WebLink
County of San Joaquin—KRC Mine Expansion <br /> Mitigation Monitoring and Reporting Program <br /> Table 1: (cont.): Mitigation Monitoring and Reporting Table <br /> Mitigation Measure Action IImplementing Party Timing Monitoring Party <br /> MM 4.5-3b:Mitigation to protect avoided features front indirect The applicant will Applicant Prior to ground Community <br /> impacts provide evidence to clearing activities, Development <br /> 1. Erosion control measures will be implemented to prevent the Community subsurface earthwork Department <br /> sedimentation from adversely affecting wetlands and other Development and on-going during <br /> waters. A tightly woven fiber netting,coconut coir netting,or Department's construction <br /> similar material(with openings less than 0.25 inches in satisfaction of this <br /> diameter)will be used for erosion control or other purposes to implementation <br /> ensure that CTS do not become entrapped. measure by survey or <br /> 2. In addition,an updated Storm Water Pollution Prevention Plan other appropriate <br /> (SWPPP)will be prepared. The SWPPP may include sediment documentation. <br /> catchments and sediment basins to intercept runoff from <br /> disturbed slopes so that that sediment is prevented from washing <br /> into adjacent drainage ways or sensitive habitats. <br /> MM 4.5-5:Mitigation for blue oak woodland The applicant will Applicant Prior to ground Community j <br /> The project would result in the direct loss of 98.80 acres of intact provide evidence to I clearing activities, Development <br /> blue oak woodland habitat. Prior to the initiation of excavation or the Community subsurface earthwork Department <br /> any excavation-related activities such as development of haul Development and on-going during <br /> roads,an Oak Woodlands Mitigation Plan shall be prepared. The Department's construction <br /> I <br /> Plan shall clearly present how mitigation would be accomplished satisfaction of this <br /> for loss of 98.80 acres of blue oak woodland. The Plan shall be implementation <br /> submitted to the County for approval. measure by survey or i <br /> other appropriate <br /> documentation. <br /> _-.._. <br /> Michael Brandman Associates 12 <br /> H:\Client(PN-Jif\1478\14780009\9-Final EIR\MMRP\14780009 Sec01-OOIv&W.doc <br />