Laserfiche WebLink
County of San Joaquin—KRC Mine Expansion <br /> N � <br /> Mitigation Monitoring and Reporting Program <br /> Table 1: (cont.): Mitigation Monitoring and Reporting Table <br /> _ <br /> Mitigation Measure Action Implementing Party Timing Monitoring Party <br /> MM 4.6-3. A qualified paleontologist shall conduct an initial field The applicant will Applicant Prior to ground Community <br /> visit of the quarry expansion area focusing on the APE prior to any provide evidence to clearing activities, Development <br /> surface disturbance. Based on the findings of this visit,the the Community subsurface earthwork Department <br /> paleontologist shall prepare a paleontological monitoring program Development and ongoing during <br /> to be implemented during excavation activities in the quarry Department's i construction <br /> expansion area. This program may include: satisfaction of this <br /> • A pre construction meeting with KRC and its employees to implementation <br /> explain the significance of resources prior to commencement of II <br /> measure by survey or <br /> initial grading of haul road or topsoil removal in the first RMA; other appropriate <br /> • A pre construction meeting prior to the commencement of documentation. <br /> topsoil removal in each RMA; <br /> • Periodic monitoring by a paleontologist at a rate to be <br /> determined by the paleontologist; <br /> • A methodology for recovery of fossils if encountered <br /> MM 4.6-4:If human remains are encountered during earth- The applicant will I Applicant During subsurface Community <br /> disturbing activities for the project,all work in the adjacent area forward to the earthwork and on- Development <br /> shall stop immediately and the San Joaquin County Coroner's Community ! going during Department <br /> office shall be notified. The County Coroner's office is responsible Development construction <br /> for coordination of removal,storage,and treatment of any human Department all formal <br /> remains found. If the remains are determined to be Native communication and <br /> American in origin,the Native American Heritage Commission determination(s)of the <br /> shall be notified and will identify the Most Likely Descendent. The San Joaquin County <br /> Most Likely Descendent will be consulted for recommendations for Coroner and Native <br /> treatment of the discovered remains(CEQA Guidelines Section American Heritage j <br /> 15064.5;Health and Safety Code Section 7050.5;Public Resources Commission, if <br /> Code). required,for the <br /> Departments review <br /> and inspection <br /> Michael Brandman Associates 14 <br /> HAClient(PN-JN)\1478\14780009\9-Pinel ElR\MMRP\l4780009_SecOI-00 MMRP.doc <br />