Laserfiche WebLink
i <br /> Chandler Martin <br /> COMMUNITY DEVELOPMENT <br /> PA-07-305 {SA) <br /> 3. The.Traffic Impact Mitigation-Fee shall be"mquired for this development. The fee is due and payable a#the <br /> time of bulidan9 permit application. The fee'currenily is$201.00 per additional trip-end.generated in the: <br /> Lathrop area the fee has been deterrni ied to be $201.00. The.feeshall be autornatica]ly:adjusfed ruly l of <br /> each year.by the Engineering Construction Cost Index as published by the Engineering News Record.) <br /> (Resolution R-00=433) <br /> 4. The Regional Traffic.Iinpact Fee shall be required for this development. The fee is due and payable at'the <br /> time of building permit application. The fee.currently is $830.00 per 1000 gross square foot of building as, <br /> manufacturing/industrial fee has been determined to be $26.56. The fee is based on the current schedule. <br /> (Resolution R-06-38). <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> MRC:13D:av <br /> PACOMMENTSISAWR 20071PA-0700305 APPLICATION.doc <br />