My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0009975
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BRIGGS
>
401
>
2600 - Land Use Program
>
PA-1400040
>
SU0009975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:34:19 AM
Creation date
9/4/2019 10:39:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0009975
PE
2606
FACILITY_NAME
PA-1400040
STREET_NUMBER
401
Direction
E
STREET_NAME
BRIGGS
STREET_TYPE
RD
City
LATHROP
Zip
95231-
APN
19334021
ENTERED_DATE
3/4/2014 12:00:00 AM
SITE_LOCATION
401 E BRIGGS RD
RECEIVED_DATE
2/28/2014 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BRIGGS\401\PA-1400040\SU0009975\APPL.PDF \MIGRATIONS\B\BRIGGS\401\PA-1400040\SU0009975\CDD OK.PDF \MIGRATIONS\B\BRIGGS\401\PA-1400040\SU0009975\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c} Mining Plan and Operating Plan <br /> The removal of the sand will be on a year round basis except for poor or <br /> bad winter conditions with the majority of the sand being removed during <br /> the spring to winter period. Upon approval of permit the removal of the <br /> sand deposits will take three years and total reclamation should be <br /> completed within two years. <br /> Equipment to be used at the project site consists of: <br /> 1 water truck, 1 wheel loader, 1 land leveling scraper <br /> d) Topsoil/Overburden <br /> The topsoil is to be excavated and hauled from field, as it is too sandy. <br /> The sandy materials will be stockpiled on-site and sold for commercial <br /> uses. After, excavation the agricultural field will be lowered at a 1.5 foot <br /> average from existing levels. No outside fill material will be used at the <br /> project site. No resoiling is needed as the dirt below the sandy topsoil is <br /> more suitable for farming. <br /> e) Mine Waste <br /> There will be no waste discharge associated with the excavation permit. <br /> All excavated materials will either be processed or used for reclamation. <br /> f) Size <br /> Total acres to be permitted is 40.9 acres <br /> Total acres to be disturbed is 40.9 acres <br /> Total acres to be reclaimed is 40.9 acres <br /> g) Water Requirements <br /> Daily consumption 3500—7000 gallon per day during summer period. Fall <br /> and spring 3500 gallons per day. No water usage during the winter time. <br /> Water is to be obtained from existing well on ranch with an overhead <br /> water stand for the loading of the water to be used. No processing of any <br /> water at this site. Only water will be used for dust control. No underground <br /> storage, above ground ponds or ground water recharging will occur at this <br /> site. <br /> h) Contaminants <br /> The only contaminant would be the diesel fuel to be used in the water <br /> truck and wheel loader. The fuel is to be stored in a 1,000 gallon self <br /> contained storage tank. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.