Laserfiche WebLink
A <br /> t <br /> Kerry Sullivan -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-03-354 (SA) <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. Additional traffic <br /> information is required. The fee will be due and payable at the time of building permit application. <br /> (The fee currently is $168.96 per additional daily trip-end generated in the Lockeford area. The <br /> fee shall be automatically adjusted July 1 of each year by the Engineering Construction Cost Index <br /> as published by the Engineering News Record.) (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. Final Site Plan is <br /> required upon submittal of verification. <br /> NOTE: Any construction activity that results in the disturbance of at least one(1) acre of soil shall require <br /> a State NPDES construction permit. <br /> DTP:DG:ar <br /> P\COMMENTS\SAWR 20031PA-0300354.wpd <br />