Laserfiche WebLink
SAN JOAQUIN COUNTY <br /> ENNv.xONMENTAL HEALTH DEPARTM—AT <br /> 304 East Weber Avenue, 3`d Floor, Stockton, CA 95202-2708 <br /> Telephone: (209)468-3420 Fax:(209)464-0138 Web:www.sjgov.org/chd <br /> NITRATE LOADING STUDY REQUIREMENT CHECKLIST <br /> PA#: <br /> SITE LOCATION: REPORT DATE: <br /> S = Sufficient San Joaquin County Development Title Chapter 9-1105,Section 9-1105.2 <br /> = Insufficient <br /> S 1 1.0 CHEMICAL AND PHYSICAL PROPERTIES OF SOI �,�� <br /> k2� <br />! � E] 1.1 Description of the chemical and physical properties of the soils underlying the site e50A.'%Sas <br /> u ❑ 1.2 Description of the mass transport properties of the soils underlying the site with respect to nitrate and/or any other <br /> constituent of concern identified for the project site.(�,- <br /> 2.0 GROUNDWATER ANALYSIS <br /> ❑ 2.1 Description of: depth to groun(jwater,3eap al uctuati ns of grouV <br /> ater depth, directional flow and gradient. <br /> ❑ 2.2 Description/discussion of any xlsting or otential groun wa er c mation issues in the general location of the <br /> site. /��— 1 er!,�„ H. 555 <br /> current use of groundwater at the site and of the future expected use of groundwater as related <br /> []� ❑ 2.3 Description of the <br /> j to the proposed development project. 3J <br /> 3.0 SOURCES AND CALCULATED IMPACT OF NITRATE TO GROUNDWATER <br /> ❑ 3.1 Description of all current off-site sources of nitrate to soil and groundwater in the general up gradient area and the <br /> � �s <br /> contribution of nitrate lo3d fr m these sources to the project site. <br /> •� 3 �-. 3•H�ss5 <br /> [� ❑ 3.2 Description of impact of rainfall ca��uuti¢n r)itrate ad to the project site. <br /> ❑ 3.3 Description of all current on-site rcesJof rattee to soil and groundwater and the contribution of nitrate load from <br /> these sources to the project site ) d,0(' <br /> ❑ 3.4 Description of all proposed future on-site Soi?rces of nitr to to soil and groundwater and the contribution of nitrate <br /> I load from these sources to the project site.�L/? 7�-3) <br /> LS ❑ 3.5 Calculated mass balance of nitrogen loading considering all potential sources identified. Use of <br /> Hanztch/F in ne more, or other appropriate formup�e`ct <br /> de[ if ap icable. <br /> �_/-&j C. <br /> ❑ 3.6 Calculated impact of nitrogen loading from site to down gradient wells, rivers, lakes etc > <br /> 4.0 DISCUSSION OF NITRATE LOADING RESULTS RELATIVE TO PROPOSED METHOD <br /> OF WASTEWATER DISPOSAL <br /> 4.1 Discussion of total nitrate impact from proposed project0 6j) <br /> ❑' [/ 4.2 Description of the methods proposed to mitigate any known or future impact to soil and gro ndwater from nitrate, <br /> and/or anv other constituent of concern, at and/or around the project sitee -e-)[�,',7� <br /> 5.0 CONCLUSIONS AND RECOMMENDATIONS SECTION�-�z <br /> 211 ❑ 5.1 The report was signed, dated and stamped by a qualified environmental professional. <br /> t [� ❑ 5.2 The attachments/appendices contain sufficient documentation to support claims made in the report. <br /> Reviewed BY Reviewed Date: <br /> I� <br /> f <br /> EHD 26-02 Pagel of 2 Surface&Sub Checklist <br /> i 7/14/2003 <br />