Laserfiche WebLink
Page 1 at 1 <br /> Date.411812004 Time:5:48 27.P.M —� <br /> pai Watkins (510)336-9118 Toan <br /> :Nuel Ha15 <br /> -1 qPR 1 U <br /> SAN IOAQCR N COMPANY INC. <br /> HE SurrE3 r S VICES <br /> 1 12.0 HOLLy,_q,OD AVENUE, YION <br /> + OAKLAND, CAUFORNiA94602-1459 FOR YOUR INFORMA <br /> Fax Number: 12094640139 <br /> To:Nuel Henderson <br /> Date : 4/18/2004 <br /> company : San Joaquin County <br /> Fax Number: (510)336-9119 <br /> From'. Dai Watkins <br /> Company :The San Joaquin Company Inc- <br /> Pages including cover Page.- 1 <br /> Subject : Groundawter Sampling 7500 West Eleventh Street Tracy California <br /> COMMENTS: <br /> NOTICE OF SCHEDULED GROUNDWATER MONITORING ROUND <br /> SJC will conduct a round of groundwater-quality monitoring on the Navarra site at 7500 West Eleventh Street, <br /> Tracy California on Wedensday April 21 st 2004. <br /> We will recover samples from all extant groundwater quality monitotring wells at the site i.e. from Well MW-1 <br /> through Well MWA 2A, including Wells 3A and 3S. <br /> We expect to start work at approximately 7:30 AM, that it will require at least all of the working day to complete <br /> the work and it may be necessary to continue on the morning of the next day to complete the monitoring round. <br /> This work is being scheduled at this time to ensure that the extant wells are monitored in the month of April <br /> 2004 as is currently required by SJCEHD. Depending upon equipment availability and weather conditions, we <br /> expect to have installed and developed twelve additional wells by the end of the working day on April 29, 2003. <br /> If that schedule is met, we will recover-samples from the new wells on April 30, 2004 at which time the depth to <br /> groundwater will be measure in all wells present on the site to provide a common basis for computing <br /> groundwater contours for the complete array of wells. <br /> Dai Watkins, Ph.D., PE <br /> The San Joaquin Company Inc <br /> SJ( <br />