Laserfiche WebLink
I GENERAL CONSIDERANS: <br /> 1. Does it appear that any environmental feature of the project will generate significant public . <br /> concern or controversy? <br /> L] Yes ® No Nature of concern(s): <br /> 2. Will the project require approval or permits by agencies other than the County? <br /> ] Yes ❑ No Agency name(s): STATE DEPARTMENT OF MENTAL HEALTH <br /> r <br /> 3. Is the project within the Sphere of Influence,or within two miles, of any city? <br /> F]Yes ❑ No City: Stockton <br /> ENVIRONMENTAL IMPACTS: <br /> "Yes" may only be checked in situations where there is substantial evidence to indicate that there <br /> may be a significant adverse impact.on the environment if there is no change in the project <br /> description. C( EQA Guidelines, Sec. 15064) <br /> See the "Discussion"section at the end of the Initial Study for explanation of any impacts checked <br /> "Yes", or any"No"answer marked with an asterisk{"). <br /> Sources: The following sources of information have been used in determining environmental <br /> impacts: <br /> Original source materials and maps on file in the Community Development Department including: , <br /> all County and City general plans and community plans; assessor parcel books; various local and <br /> FEMA flood zone maps; service district maps; maps of geologic instability; maps and reports on <br /> endangered species such as the Natural Diversity Data Base; noise contour maps; specific <br /> roadway plans; maps and/or records of arch eologicallhistoric resources; soil reports and maps; <br /> etc. Many of these original source materials have been collected from other public agencies or <br /> from previously prepared EIR's and other technical studies. <br /> Additional standard sources which should be specifically cited below include on-site visits by staff <br /> (note date); staff knowledge or experience; and independent environmental studies submitted to <br /> the County as part of the project application(note report title, date, and consultant). <br /> 1. Water: <br /> a. Is any portion of the project subject to flood hazard? <br /> Flood zone: Pane1#060302 0200 [:]Yes No <br /> b. Will the project result in reduction of surface or groundwater <br /> quality or quantity? [-]Yes No <br /> c. Will the project result in increases to surface,channel or <br /> stream volumes, or alterations to drainage patterns and streams? [-]Yes FJ No <br /> Initial Study -2 - Revised 5-00 <br />