Laserfiche WebLink
� i b. Will the project res(-`�n increased noise or vibration levels? ❑Yes E] No <br /> .; <br /> Other sources used: <br /> 3 6. EneraylNatural Resources: <br /> a. Will the project use substantial amounts of fuel or energy, require a <br /> substantial increase in demand upon existing sources,or require the <br /> development of new sources of energy? ❑Yes ® No <br /> b. Will the project affect the potential use, extraction,conservation, <br /> or depletion of a natural resource(other than agricultural land)? ❑Yes ® No <br /> Other sources used: <br /> 7. Hazards: <br /> a. Will the project create a risk of explosion; release,generate or store <br /> Any hazardous substances;or cause other dangers to public health and <br /> safety? []Yes ® No <br /> b. Are there any known hazardous substances located within 500 feet of <br /> the boundaries of this project, if in an existing or proposed residential <br /> area (this could include possible groundwater contamination)? [-]Yes ® No <br /> c. Will the project result in interference with, or need for, emergency plans? ❑Yes ® No <br /> Other sources used: <br /> 8. Utilities and Public Service: <br /> a. **Will the project require alteration of, addition to, or the need for new <br /> utility systems(water, sewer, drainage, solid waste), including a <br /> Sphere of Influence or district boundary change? ❑Yes ® No <br /> b. **Will the project result in the need for or the expansion of the following <br /> services: fire and police protection,schools, parks and recreation, <br /> libraries,roads,flood control, solid waste or other public works <br /> facilities, public transit, or governmental services? []Yes ® No <br /> c. Will the project adversely impact existing recreational/park <br /> opportunities or require new park/recreationopportunities? ❑Yes ❑ No <br /> Note: ** "Yes"answers to these two questions and 9 (b) below will require <br /> additional discussion,but do not necessarily indicate a potentially significant impact. <br /> Other sources used: <br /> 9. Transportation/Circulation: <br /> a. Will the project generate significant traffic volumes and/or make a <br /> Initial Study -4- Rev 5-00 <br />