Laserfiche WebLink
Mr. Russ Zelmer <br /> 7060 W. Durham Ferry Rd. <br /> Tracy, CA 95304 <br /> Date: April_, 2008 <br /> Attn.: Mr. Zelmer <br /> Subject: Access to Parking Lot at 7501 West Eleventh t Tracy, California for <br /> Groundwater Remediation <br /> Dear Mr. Zelmer: ' <br /> Since 1999, the San Joaquin Company Inc. (SJR .pis been w4 ing under the C of the <br /> San Joaquin County Department of Environmental t D) to moni r and manage <br /> groundwater affected by releases of gasoline and dies t occurred at Mr. Carl Navarra's <br /> property at 7500 West Eleventh Street,� Tracy, Californ ocated across the highway from <br /> your property at 7501 West Eleventh StfEo�r. the past seve cars we have been sampling <br /> groundwater in monitoring wells that are to N, your propert . <br /> At this stage of our work we have bec� irect �i�l 5CEHD to actively remediate <br /> groundwater affected by�g � and diesels locate eneath the southeast corner of the <br /> parking lot at 7501 Wes levee treet and beath the adjacent land to the south. <br /> The remediation work t ves e ' v ation of on eft. long by 4-ft. wide trench from which <br /> groundwater will be purr e• , Te- y itoY ac trucks and shipped off-site for disposal. At <br /> present, th�ee,r�% r�,; � ossible o�ations fort ench (see attached Figure 1). The trench will be <br /> excavate�deithcr jus� ide th s-�theast corner of the parking lot along its Eleventh Street <br /> fronta it will be exc a d throat the parking lot paving a short distance inside its curb. A <br /> final de ' io regarding th act tre' location will be made in the field following a detailed <br /> survey o 'e. locations o rider round utilities. After working hours, or whenever the <br /> construction c s not pres � at the site,:the open trench will be enclosed within a locked, 6-ft. <br /> high, temporary,ch��.in-link f�CC. <br /> When the work is col ted, the trench will be backfilled and the area returned to its present <br /> condition. That workwill include full restoration of the parking lot paving, including any <br /> damage that may occur due to operation of the construction equipment. The area of the parking <br /> lot that will be occupied by construction equipment and materials is shown on the Figure, but, in <br /> addition, it will be necessary for trucks to enter and leave the site via both the Chrisman Road <br /> and West Eleventh Street entrances. <br /> We expect the work, including restoration, to be completed within less than 10 days from the <br /> time the operations begin. However, for planning purposes, we must assume that it might <br /> possibly extend for a period up to one month. <br />