Laserfiche WebLink
h <br /> U 1 <br /> b. The driveway approach shall be improved in accordance with the requirements of San Joaquin <br /> County Standards CW-C12 prior to issuance of the occupancy permit. (Development Title Section 9- <br /> 1145.5) <br /> c. Dedication to result in a 25-foot-wide right-of-way from the centerline of Carlton Road to the property <br /> line shall be required across the 25-foot-wide access. (Development Title Section 9-1150.5) <br /> d. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable <br /> at the time of building permit application. The fee currently is$1,387.00 per 1,000 gross square feet <br /> of building designated as Service Commercial in the Stockton area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published by the <br /> Engineering News Record. (Resolution 00-433) <br /> e. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is <br /> due and payable prior to issuance of building permits. The fee currently is$569.00 per 1,000 gross <br /> square feet of building designated as Service Commercial. The fee shall be automatically increased <br /> on January 1 of each year through the year 2005 at the rate of 7.66 percent. (Development Title <br /> Section 9-818.4, Resolution R-97-5) <br /> f. The applicant shall provide will-serve letters for water service, sewer service, and storm drainage. <br /> g. A copy of the Final Site Plan shall be submitted prior to the release of building permits. <br /> h. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. The Final Site Plan is <br /> required upon submittal of verification. <br /> i. The Regional Transportation Impact Fee shall be required for this development. The fee is due and <br /> payable at the time of building permit application. The fee currently is$780.00 per 1,000 gross <br /> square feet of building designated as Service Commercial. The fee is based on the current <br /> schedule. (Resolution R-06-38) <br /> NOTE: Any construction activity that results in the disturbance of at least one acre of soil shall <br /> require a State NPDES construction permit. <br /> 4. SAN JOAQUIN COUNCIL OF GOVERNMENTS(Staff Contact: Anne-Marie Pogglo-Castillou, 468- <br /> 3913) <br /> a. This project is not subject to participate in the San Joaquin County Multi-Species Habitat <br /> Conservation and Open Space Plan (SJMSCP) at this time due to structure and ground disturbance <br /> already existing. Any future structures that require ground disturbance on this or subsequent divided <br /> parcels will be subject to participate in the SJMSCP. <br /> 5. SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT(Staff Contact: Jessica Willis, 559- <br /> 230-5888) <br /> a. The proposed project is subject to District Rule 9510. <br /> San Joaquin County PA-0400396113i shop <br /> Community Development Page 4 <br />