Laserfiche WebLink
c. Dedication to result in a 25-foot-wide right-of-way from the centerline of Carlton Road to the property <br /> line shall be required across the 25-foot-wide access. (Development Title Section 9-1150.5) <br /> d. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable <br /> at the time of building permit application. The fee currently is$1,387.00 per 1,000 gross square feet <br /> of building designated as Service Commercial in the Stockton area. The fee shall be automatically <br /> adjusted July'1 of each year by the Engineering Construction Cost Index as published by the <br /> Engineering News Record. (Resolution 00-433) <br /> e. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is <br /> due and payable prior to issuance of building permits. The fee currently is$569.00 per.1,000 gross <br /> square feet of building designated as Service Commercial. The fee shall be automatically increased <br /> on January 1o each year through the year 2005 at the rate of 7.66 percent. (Development Title <br /> Section 9-818.4, Resolution R-97-5) <br /> f. The applicant shall provide will-serve letters for water service, sewer service, and storm drainage. <br /> g. A copy of the Final Site Plan shall be submitted prior to the release of building permits. <br /> h. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. The Final Site Plan is <br /> required upon submittal of verification. <br /> NOTE: Any construction activity that results in the disturbance of at least one acre of soil shall require a <br /> State NPDES construction permit. <br /> San Joaquin County PA-04003961Stockton Chinese Baptist Church <br /> Community Development Page 11 <br />