My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004579
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CARLTON
>
2315
>
2600 - Land Use Program
>
PA-0400396
>
SU0004579
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 10:04:30 AM
Creation date
9/4/2019 10:55:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004579
PE
2631
FACILITY_NAME
PA-0400396
STREET_NUMBER
2315
Direction
N
STREET_NAME
CARLTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
12310038
ENTERED_DATE
7/26/2004 12:00:00 AM
SITE_LOCATION
2315 N CARLTON AVE
RECEIVED_DATE
7/20/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\C\CARLTON\2315\PA-0400396\SU0004579\REV SITE PLN.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y r <br /> c. Dedication to result in a 25-foot-wide right-of-way from the centerline of Carlton Road to the property <br /> ine'shall be.required across the 25-foot-wide access. (Development Title Section 9-1150.5) <br /> d ;The Traffic Irripact Mitigatioh Fee shall be.required for this development. fhe fee-is due.and payable <br /> at th0-timeof.buwlding permit application `The fee currently'is$1;387:00 p&1;000 gross square feet <br /> of Wilding:de'signatetl as Sernce Commercial in the Stockton area..The fee:shall be automatically <br /> ad�uste'd July1 of each year by the.Engirieenng Construction Cost Index as published by.the <br /> Engme'enng:News Record.<(Resolution 0033) <br /> e `.:The Water Supply Facilities,ImpactrMitigation Fee shall.be required for this.development.'The fee is <br /> due and payable prior to,issuance of building.permits. The fee currently is$569.00 per 1;000 gross <br /> square.feet of building desighated.as Service Commercial. The fee shall be'automabcally increased <br /> on January Vof each year through the year 2005 at the rate of 7.66 percent..(Development Title <br /> Section b-818.4;Resolution R-97-5) <br /> f.'L The applicant shall provide will-serve letters for water service, sewer service, and storm drainage. <br /> g. A copy of the:Final Site Plan shall be submitted prior to the release of building permits. <br /> h. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. The Final Site Plan is <br /> required upon submittal of verification. <br /> NOTE: Any construction activity that results in the disturbance of at least one acre of soil shall require a <br /> State NPDES construction permit. <br /> San Joaquin County PA-04003961Stockton Chinese Baptist Church <br /> Community Development Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.