Laserfiche WebLink
y r <br /> c. Dedication to result in a 25-foot-wide right-of-way from the centerline of Carlton Road to the property <br /> ine'shall be.required across the 25-foot-wide access. (Development Title Section 9-1150.5) <br /> d ;The Traffic Irripact Mitigatioh Fee shall be.required for this development. fhe fee-is due.and payable <br /> at th0-timeof.buwlding permit application `The fee currently'is$1;387:00 p&1;000 gross square feet <br /> of Wilding:de'signatetl as Sernce Commercial in the Stockton area..The fee:shall be automatically <br /> ad�uste'd July1 of each year by the.Engirieenng Construction Cost Index as published by.the <br /> Engme'enng:News Record.<(Resolution 0033) <br /> e `.:The Water Supply Facilities,ImpactrMitigation Fee shall.be required for this.development.'The fee is <br /> due and payable prior to,issuance of building.permits. The fee currently is$569.00 per 1;000 gross <br /> square.feet of building desighated.as Service Commercial. The fee shall be'automabcally increased <br /> on January Vof each year through the year 2005 at the rate of 7.66 percent..(Development Title <br /> Section b-818.4;Resolution R-97-5) <br /> f.'L The applicant shall provide will-serve letters for water service, sewer service, and storm drainage. <br /> g. A copy of the:Final Site Plan shall be submitted prior to the release of building permits. <br /> h. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. The Final Site Plan is <br /> required upon submittal of verification. <br /> NOTE: Any construction activity that results in the disturbance of at least one acre of soil shall require a <br /> State NPDES construction permit. <br /> San Joaquin County PA-04003961Stockton Chinese Baptist Church <br /> Community Development Page 11 <br />