Laserfiche WebLink
Cascade Energy Storage, LLC Battery Storage Project <br /> Equipment Type Quantity <br /> Truck Crane 1-2 <br /> II Terrain Crane 1-2 <br /> Forklift 1-2 <br /> Construction Water Use <br /> During construction of the proposed project, water would be required for common construction related <br /> purposes, including but not limited to dust suppression,soil compaction,and grading. Dust-control water <br /> may be used for ingress and egress of on-site construction vehicle equipment traffic and for the <br /> construction of the energy storage equipment. A sanitary water supply would not be required during <br /> construction, because restroom facilities would be provided by portable units to be serviced by licensed <br /> providers. <br /> During the 9-month construction period, the water used is anticipated to be purchased and supplied by <br /> the truck. Water demand during construction is expected to be the same if the project is constructed <br /> during a year with normal precipitation, a year with less-than-average precipitation, or a multiyear period <br /> of less-than-average precipitation. <br /> Solid and Nonhazardous Waste <br /> The project site would produce a small amount of solid waste from construction activities. This may <br /> include paper, wood, glass, plastics from packing material, waste lumber, insulation, scrap metal and <br /> concrete, empty nonhazardous containers, and vegetation waste. These wastes would be segregated, <br /> where practical,for recycling. Non-recyclable wastes would be placed in covered dumpsters and removed <br /> on a regular basis by a certified waste-handling contractor for disposal at a Class III landfill. <br /> Hazardous Materials <br /> The hazardous materials used for construction would be typical of most construction projects of this type. <br /> Materials would include small quantities of gasoline, diesel fuel, oils, lubricants, solvents, detergents, <br /> degreasers, paints, ethylene glycol, dust palliative, herbicides, and welding materials/supplies. A <br /> hazardous materials business plan would be prepared. The hazardous materials business plan would <br /> include a complete list of all materials used at the battery storage project and information regarding how <br /> the materials would be transported and in what form they would be used. This information would be <br /> recorded to maintain safety and prevent possible environmental contamination or worker exposure. <br /> During project construction, safety data sheets(SDS)for all applicable materials present at the site would <br /> be made readily available. <br /> Page 11 <br />