Laserfiche WebLink
U <br /> Rick Griffin -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-07-293 (UP) <br /> aFe needed. <br /> 2,GaItFans input on the SR 120/Caffelten Read ifiteFSeC68H. =aryelton Read, Lone T-fee�jack Tone <br /> The developer shall deposit Pandswith the as dotefmined by the "..—A of Public W <br /> T-fanspoi4ation Planning Division,priEw to Department of Pub! orks pr-eparing or-e0fliffteting for-the I:eq <br /> stiady. Any Mitigation fequir-ed by�he tfaffiry study shall be provided by the applieant. (Development Title Seetie <br /> 9 1-150,4) <br /> Upen satisfaetion of the above r-equirefflents,the following Conditions of Appf oval may apply. Additional an&e <br /> p,; a <br /> RECOMMENDATIONS: <br /> 1. An encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of San Joaquin County <br /> Standards R-17 prior to issuance of the occupancy permit. (Development Title Section 9-1145.5) <br /> 3. Dedication to result in a twenty-five (25) foot wide right-of-way from the centerline of Carrolton Road to <br /> the property line shall be required across the frontage of APN: 205-070-20. (Development Title Section 9- <br /> 1150.5) <br /> 4. The frontage improvements for Carrolton Road shall be constructed in conformance with the standards for <br /> one-half of a fifty (50)-foot right-of-way rural road. (Development Title Section 9-1150.2) <br /> 5. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of each building permit application. (The fee currently is $ 201.50 per daily trip-end generated in the <br /> Escalon area. The fee shall be automatically adjusted July i of each year by the Engineering Construction <br /> Cost Index as published by the Engineering News Record.) (Resolutions R-00-433) <br /> 6. The Regional Traffic Impact Fee shall be required for this development. The fee is due and payable at the <br /> time of each building permit application. The fee currently is $1390.00 per 1000 gross square foot of <br /> building classified as Service Commercial. The fee is based on the current schedule. (Resolution R-06-38) <br /> 7. A copy of the Final Site Plan shall be submitted prior to release of building permit. Show onsite traffic <br /> circulation, staging, as well as entrance and exit plans relevant to inflow and outflow of vehicles during drop <br /> off and ick qp times of students. Refer to the traffic study for trip volumes during critical times. The plan <br /> should account for staging areal, utilized as drop off / pick up zones close to the school's internal <br /> pedestrian walkways. Conflict points between pedestrian and vehicles should be avoided. Parking aisles <br /> may be utilized as queuing zones during peak hour times to prevent overflow of traffic onto the public <br /> roadways. A separate parking area for school fatuity should be established away from the main (general <br /> public) parking areas. Establish internal NO STOPPING/PARKING areas as necessLryto reserve a clear <br /> staging area (drop off 1 pick up). <br />