Laserfiche WebLink
PROJECT DATA: <br /> PHASE I (BY 2010): SMALL CHAPEL <br /> APPROX. 2,000 S.F. <br /> PHASE If BY 2017 : LARGE CHURCH <br /> PROPOSED 2 , 000 S. E. APPROX. 20,000 S.F. <br /> PHASE III (BY 2027): SCHOOL & YOUTH CENTER <br /> CHAPEL APPROX. 50,000 S.F. <br /> PHASE IV (BY 2037): COMMUNITY CENTER & MINISTRY OFFICE <br /> APPROX. 30,000 S.F. <br /> 1304.4' <br /> PARKING: <br /> z <br /> AUDITORIUM SEATING = 750 PEOPLE <br /> PROVIDE 1 PARKING STALL PER 3 PEOPLE <br /> CONVENT CHAPE <br /> TOTAL PARKING REQUIRED: 750/3 = 250 SPACES <br /> KINDERGARTEN/ PROPOSED TOTAL PARKING PROVIDED = 312 SPACES <br /> EIGTH GRADE WELL a <br /> EDUCATION <br /> OPEN AREA — s LLJ LANDSCAPING: <br /> V) <br /> O TOTAL SITE AREA - 21.7 ACRES <br /> OPEN AREA d <br /> 0 <br /> MULTI-USE a UNDEVELOPED AREA/OPEN FIELD (FUTURE) = 8.9 AC. <br /> CENTERO OPEN FIELD/STORM DRAIN BASIN = 5.6 AC. <br /> PROPOSED DEVELOPED SITE = 7.2 AC. <br /> PROPOSED w PROPOSED LANDSCAPING (DEVELOPED SITE) = 1,90 AC, <br /> SEPTIC TANK I <br /> 0 Q LANDSCAPE PERCENTAGE (PROPOSED SITE):1.90/7,2 = 26% <br /> _j 7�-N <br /> LEECH FIELD <br /> PHASE III DEVELOPMENT (FUTURE) € w <br /> PHASE IV DEVELOPMENT (FUTURE) LU LU o <br /> YOUTH CENTER/ ¢ <br /> CCD & RELIGIOUS = <br /> EDUCATION <br /> ca <br /> _ < <br /> M <br /> ADMINISTRATION <br /> 0 Zumwalt Rd <br /> PLAY AREA OFFICE/MINISTRY INS <br /> 9laakmoo*Rd <br /> OFFICE MEETING Loulln A nrr Rd <br /> OPEN AREA AREAAyors Rd <br /> z91shotc Rd <br /> 9ustka Rd <br /> --------- o <br /> PR JECT SITE <br /> NYose Iia Ave <br /> a <br /> Simms �d <br /> E <br /> (V cad°rA <br /> - --_ �► <br /> IAIIR»Rd Fri NITT I <br /> Ni <br /> Cedar Eat le t,b * Craig Rd <br /> IL <br /> w 3 <br /> l� � Illirtrris R <br /> e e e e PTCS N e e e a <br /> ] allo Rd q ana Rd <br /> Yahmi rile 02004 Nl11VTE <br /> L CH FIELD 510N <br /> ® VICINITY MAP <br /> APN : 205-0 -20n- 2 1 <br /> E <br /> RETENTION BASIN <br /> TO DOUBLE AS PLAYeF <br /> AREA(SOCCER OR <br /> BASEBALL FIELD) `- <br /> M Ilk <br /> ECH FIELD 51 PR POSED 20, 000 S. E. <br /> CH RCH AUDITORIUM <br /> 0 S <br /> Ip Q PT N o q <br /> I <br /> �k I A�Ni �-k �44 1 �k;4� <br /> ---- --- - -=- � �� °sTA�11sa� 'sdAJrts'• 'r��11Jh��• <br /> 1304.4' <br /> TRASH ENCLOSURE <br /> I 0'X1 O'X6' TALL <br /> MASONRY <br /> E <br /> i= <br /> i Q <br /> MI <br /> 7n <br /> NORTH <br /> Q <br /> I <br /> I <br /> I <br /> N <br /> aV <br /> I <br /> CO <br /> SCALE: 1" = 50'-0" M <br /> Uj <br /> The design, planning and engineering JOB No. 76213CL <br /> data contained in this Ian are the sole R E V I S 1 0 N S DATE 6-15-07 w <br /> roperty of R. B. Weityp& Assoclotes, Inc. No. DESCRIPTION BY DATE DR TPRn B. WELTY & ASSOCIATES, SITE PLAN _� <br /> and shaft rot be used, copied or dup - INC. <br /> QVIUSTRUCTURAL ENGINEERS SHEET <br /> licated in pari or in whole by any other CK `'�` N <br /> person, Corporation or Company without ST.. PATRICK'S CHURCH r- <br /> the written permission of R. B. Welty & APPROVED P.O. BOX 1724 (MAILING ADDRESS) FELIX J. REICHMUTH SE 2090, C 20208 SP2 o <br /> Associates, Inc. This drawing is not to 17495 S. C A R R O L T O N RD. CD <br /> ,e used for Construction until it is app— 521 131h STREET (LOCATION) MODESTO, CALIFORNIA 95353 — 1724 (209) 526- 1515 JUSTIN W. CAPP SE 4813, C 61393 ESCALON, CA. 95320 of <br /> roved, signed, sealed and dated. <br />