Laserfiche WebLink
GEO-PHASE <br /> ENVIRONMENTAL <br /> October 14, 2009 <br /> n GPE Project No.: 607.1 <br /> Mr. Felix Reichmuth <br /> R.B. Welty & Associates <br /> PO Box 1724 <br /> Modesto, CA 95353 <br /> Re: Revised Soil Suitability and Nitrate Loading Study <br /> St. Patrick's Church Expansion <br /> E [' 17495 S. Carrolton Road, Escalon (APN 205-070-20) <br /> IF (PA-0700293) <br /> Dear Mr. Reichmuth: <br /> i <br /> Geo-Phase Environmental, Inc. is pleased to submit this Soil Suitability and <br /> Nitrate Loading Study covering your proposed project to construct a new Chapel <br /> + and other structures at the subject site. This report is in fulfillment of San <br /> Joaquin County EHD requirements. <br /> i f <br /> We appreciate this opportunity to serve your environmental needs. <br /> Respectfully submitted, <br /> Geo-Phase Environmental Inc. <br /> Stephen M. Lankford <br /> President <br /> Enclosures <br /> �r Ik <br /> 5 <br /> r ' 2937 Veneman Ave.,,#B240 Geo_Phase Environmental Inc. Phone: (209) 569-0293 <br /> Modesto, CA 95356 Fax. (209) 569-0295 <br />