Laserfiche WebLink
J <br /> COUNTY OF SAN JOAQUIN <br /> . 'X DEPARTMENT OF PUBLIC WORKS THOMAS R.FL1NN <br /> DEPUTY DIRECTOR <br /> P,O.BOX 1810- 1810 EAST HAZELTON AVENUE MANUEL LOPEZ <br /> STOCKTON•CALIFORNIA 95201-1810 DEPUTY DIRECTOR <br /> cR'��xnsN:P 209/468-3000 STEVEN WINKLER <br /> FAX:209/468-2999 DEPUTY DIRECTOR <br /> HENRY M. HIRATA <br /> DIRECTOR <br /> December 7, 1999 DEC <br /> MEMORANDUM Community DeveiCpI ent Dept <br /> TO: Thomas M. Gau, Senior Civil Engineer <br /> Community Development Department <br /> CONTACT PERSON: Jeff Fisher <br /> FROM: Gabriel Karam, Senior Civil EngineerG k` <br /> Public Services Division <br /> SUBJECT: UP-99-23 A USE PERMIT APPLICATION FOR MAUSOLEUM STRUCTURE- l <br /> INTERNMENT OF HUMAN REMAINS ABOVE GROUND; TOTAL CAPACITY <br /> 522 CASKET SPACES. TO BE COMPLETED IN TWO PHASES;PHASE I # <br /> COMPLETED BY JANUARY 2000,AND PHASE 11 COMPLETED BY <br /> JANUARY 2004,LOCATED ON THE WEST SIDE OF CARROLTON ROAD, <br /> 200 FEET NORTH OF STATE HIGHWAY ROUTE 120, WEST OF ESCALON. <br /> (DISTRICT 5). <br /> APPLICANT: The Roman Catholic Bishop of Stockton APN: 205-070-25 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood <br /> Hazard Area. <br /> Carrolton Road has an existing right-of-way width of 40 feet and a planned right-of-way width of 50 feet. I <br /> RECOMMENDATIONS: <br /> 1. Encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of San Joaquin <br /> County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is$1,054 per I,000 gross <br /> square foot of building as service commercial in the Ripon area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published by the <br /> Engineering News Record.) <br /> (Resolutions R-90-304, R-91-1025,R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> GK:RH:gn <br /> PS-9LO35-GI9 <br /> E: Manuel Lopez, Deputy Director/Development <br /> i <br />