Laserfiche WebLink
i <br /> 1.. Enomers Esflmafs:76W W.Eievanth Stns Tracy <br /> i <br /> t <br /> ENGINEER'S ESTIMATE FOR <br /> REFINED PLUME DEFINITION AND MANAGEMENT OF FLOATING PRODUCT <br /> Task i -Repulatwy Conaut"dons <br /> item No. Units Unit Rab Extension <br /> Senior Engineer a Hours 90.00 720.00 <br /> 'L Word Processor 3 Hours 35.00 105.00 <br /> FkW Vahkde 2 Day 35.00 70.00 <br /> �. Mlsceflaneous Expenses 1 Lot 25.00 26.00 <br /> 15%of Engineer's Direct Costs 1 Lot 3.75 3.75 <br /> Subtotal Task 1-Reputatory Consultation . $923.75 <br /> Task 2 -Prepare Work Plan <br /> (Including preliminary design.engineers estimates and evaluation of three Boating product management Wdvx fogies.) <br /> Nun No. Units Unit Rats Extanalon <br /> Senior knew 2 Hours 90.00 180.00 <br /> �, Assistant�nw 33 Hours 75.00 Z476.00 <br /> Technician 33 Hours 40.00 1.320.00 <br /> i Drafhpersan 40 Hours 40.00 1,500.00 <br /> L <br /> Word Processor 20 Hours 35.00 700.00 <br /> Work Plan Reproduction 8 Links 30.00 180.00 <br /> .�✓ SW Work Plan 1 Lot 30.00 30.00 <br /> t <br /> Miscellaneous Expertmes 1 Lot 75.00 75.00 <br /> 15%of Engkreers Dhed Costs 1 Lot 42.76 42.75 <br /> Sul-I Task 2-Work Plan 54,402.73 <br /> r <br /> Task 3 -Prepare Health and Safely Plan <br /> Ibm No. Unita Unit Rats Extension <br /> s : <br /> Senior Engineer 0.5 Hours 90.00 45.00 <br /> Assistant Engineer 2 Hours 75.00 150.00 <br /> DreBsperson 1 Hours 40.00 40.00 <br /> k <br /> ,6- Ward Processr 1 Hours 36.00 35.00 <br /> Health and So"Plan Reproduction 3 Unks 5.00 15.00 <br /> Imw 15%of Direct Casts 1 Lot 2.25 2.25 <br /> Subtotal Task 3-Health and Safety Pian ;267.25 <br /> 1r <br /> i <br /> i~. <br /> Page 1 of 7 sic <br /> r <br />