Laserfiche WebLink
�. Engineer's EaBmele:7sw W.Ebmuh Street Tracy <br /> ti <br /> TASK 7A- First Round of Sampling and Analysts of Potable Water Supply Wells <br /> (Including negotiation of wa4 owners'audwrizalDns,instruction of required sampling ports an walls, one round of <br /> sampling and analysis and Inclusion of analytical results In C+rountloot r-qualfly Monitoring Repoli:) <br /> Item No. Units Unit Rab Extenalon <br /> $ <br /> Senior Engineer D.5 Hours 90.00 45.00 <br /> Assistant Engkwer 20 Hours 75.00 1,500.00 <br /> Field Technkcian 8 Hours 40.DO 320.00 <br /> Technician 2 Hours 40.00 80.00 <br /> Word Processor 1 Hours 35.00 35.00 <br /> Field Vefdcle 2 Day 35.00 70.00 <br /> Well Part Components 4 Set 200.00 800.00 <br /> TPH(d)in Water with EPA McBiod 3830M Cleanup 6 No. 9D.00 540.00 <br /> TPH(g),BTEX,Fuel Oxyg.,EDB and EDC In Water a No. 150.00 900.00 <br /> Electronic Geotrac ker Data Fla 8 No. 3A0 95.00 <br /> Rac.Expenses 1 No. 100.00 100.00 <br /> Is, 15%of Diced Casts 1 Lot 30.00 30.OD <br /> Sublotai Task 7A- Sampling arra Analysis of PotabN Water Supply Wails !4,818.00 <br /> TASK 70-Second and subsequent Rounds of Sampling and Analysis of Potable Water Supply Wells <br /> (YVIBr qr waon of analytical results In Groundwater quaitly monkoing report) <br /> Item No. Unite Unit Rate Extension <br /> Assistant Engineer 8 Hours 75.00 800.00 <br /> TedrMan 2 Hours 40.00 80.00 <br /> �. Word Processor 0.5 Hours 35.00 0.00 <br /> Field Vehicle 1 Day 35.00 35.00 <br /> TPH(d)in Water with EPA Method 35WM Cleanup 8 No. 90.00 640.00 <br /> TPH(g),BTIM Fuel Oxyg.,EDB and EDC in Water 6 No. 160.0D 900.00 <br /> Electronic Geofradcer Data File 8 No. 3.00 95.OD <br /> Misc.Expenses 1 140. 100.00 100.00 <br /> 15%of Engineer's Direct Costa 1 Lot 15.00 15.00 <br /> k <br /> Subtotal Task 78-Field Work t+2,3g5•� <br /> 4 TASK S-Floating Product Management <br /> See separate estimate for each teciml gy on following payee <br /> ,110p' <br /> L <br /> V <br /> Page 5 of 7 SJC <br />