Laserfiche WebLink
r " <br /> For►ner Fueling Station-7500 W. I Ith St., Tracy,CA <br /> ENGINEER'S ESTIMATE FOR <br /> w REFINED PLUME DEFINITION AND MANAGEMENT OF FLOATING PRODUCT <br /> `r <br /> Technology A - Cut-off Trench and High Volume Pumping of LNAPL <br /> tW <br /> Capita!Cost <br /> (including final design,field engineering two rounds of floating product extraction and one round of groundwater extraction <br /> and inclusion of Heid data in quartsriy groundwater quality monitoring report <br /> v.. <br /> Item No. Unita Unit Rate Extension <br /> S S <br /> err Senior Engineer 0.5 Hours 90.00 45.00 <br /> Assistant Engineer 48 Hours 75.00 3,600.00 <br /> 4W Technician 6 Hours 40-DO 240.00 <br /> Draftsperson 10 Hours 40.00 400.00 <br /> Word Processor 4 Hours 35.00 140.00 <br /> Groundwater Monitoring Well Permit 1 No 200.00 200.00 <br /> R <br /> Bonding for Construction In Public Highway 1 Yearly 500.00 500.00 <br /> System Installation Cost(see attached sheet) 1 Lot 38,863.55 38,963.55 <br /> t <br /> Field Vehicle 5 Day 35.00 175.00 <br /> TPH(d)in Soil 15 No. 50.00 750.00 <br /> TPH(g)plus BTEX In Soil 15 No. 65.00 975.00 <br /> b <br /> Groundwater Level Meter 1 Day 25.00 25.00 <br /> Vacuum Lance Sight Glass 1 No. 300.00 300.00 <br /> �Yr <br /> Pump LNAPL and Groundwater Into Vacuum Truck 2,000 gal. 3.00 6,ODO.00 <br /> Transport and Dispose(1000 gallons per round) <br /> Pump Contaminated Groundwater into Vacuum Truck 5,000 gal. 3.00 15,OD0.00 <br /> Transport and Dispose(5000 gallons per round) <br /> Miscellaneous Expenses 1 Lot 100.00 100.00 <br /> 15%of Engineer's Direct Cost 1 Lot 25.00 25.00 <br /> Subtotal Technology A Capital Cost W,313.55 <br /> Opemiing Cost <br /> Rom No. Units Unit Rah Extenslon <br /> s s <br /> This Floating Product Remedlation Technology 1 Lot 0.00 O.DO <br /> Has No Operating Cost. <br /> Subtotal Technology A Operating Cost ;0.00 <br /> Page t of 3 sic <br />