Laserfiche WebLink
Far w fr jgHng Station-7500 W. 11th St., Tfacy,CA <br /> IMF ENGINEER'S ESTIMATE FOR <br /> REFINED PLUME DEFINITION AND MANAGEMENT OF FLOATING PRODUCT <br /> t*r Technology B-Pumping of LNAPL from Extraction Wells Into Vacuum Trucks <br /> capes Cost <br /> (Including flnal engineering designone round of floating product extraction,and inclusion of data in <br /> groundwater.quelity monitoring report) <br /> low <br /> item <br /> No. Un)b Unit Raft' Extension <br /> � S i <br /> � Assistant Engineer 28 Hours 75.00 2,100.00 <br /> Field Technician <br /> 24 Hour 40.00 680.00 <br /> iTechnician <br /> �e 3 Hour 40.00 120.00 <br /> Word Processor <br /> 2 Hour 35.00 70.00 <br /> 1 Field Vehicle 3 Day 35.00 105.00 <br /> )w <br /> installation Cost(See attached sheet) 1 Lot 7,472.50 7,472.50 <br /> TPH(d)In Solt 15 No. 50.00 750.00 <br /> TPH(g)plus BTEX in Soil 15 Na. 65.00 675.00 <br /> Surveyor's Tag(2008) <br /> 1 Day 5.00 5.00 <br /> L, Groundwater Level Meter 1 Day 25.00 25.00 <br /> LNAPLIGroundwater Interface Probe 1 Day 50.00 50.00 <br /> Well Head Let.,Long and Elev.Survey far GeoTracker Compliance 1 Lot 1,300.00 1,300.00 <br /> sem' <br /> Vacuum Lance Sight Glass 1 No 300.00 300.00 <br /> Pump LNAPL and Groundwater Into Emulsion Vacuum Truck 500 gal. 3.00 1,500,00 <br /> L. Transport and Dispose(SW gallons per round) <br /> Miscellaneous Expenses 1 Lot 50.00 50.00 <br /> 15%of Direct Costs i Lot 7.50 7.50 <br /> 4 <br /> Total Capital Cost•Technology B :15,790.00 <br /> Cost per Round of AddldoaW OrounaWater Extraction(Op0010fl <br /> (Assumes 500 gallons extracted per round,Includes data record In groundwater quality monitoring report.) <br /> hem No. Units Unit Rab Extension <br /> s $ <br /> Assistant Engineer 12 Hours 75.00 600.00 <br /> Field Technician a Hours 40.00 320.00 <br /> Technician 2 Hour 40.00 80.00 <br /> Word Processor 1 Hours 35.00 35.00 <br /> i� <br /> ,rr <br /> v <br /> >� <br /> sic <br />