Laserfiche WebLink
�+ Work Plan far Refined Plume Definition and Management ofFloating Product-7500 W 11th St., Tracy, CA, Page 55 <br /> stockpile will be quartered and a total of four samples will be taken, one from each quarter. <br /> The samples will be recovered by driving a clean, 2-in. diameter by 4-in. long, brass <br /> sampling tube into the bottom of a pit dug into the stockpile at each of the four designated <br /> .. sampling locations until the tube is completely filled with soil. <br /> Following sample recovery, each sample tube will be cleaned externally, its ends covered <br /> .�.. with a Teflon sheet and closed with tightly-fitted plastic caps. The caps will be secured with <br /> adhesiveless tape. Each sample tube will be labeled for identification, entered into chain-of- <br /> custody control and packed on chemical ice for transport to STL's laboratory in Pleasanton, <br /> California. <br /> At the laboratory, the samples will be composited and the composite sample will be analyzed <br /> -- for the same suite of analytes listed in Section 9.4.1.3.1 above. If the stockpiled soil is shown <br /> to be free of analytes of concern at concentrations above regulatory limits, that soil will be <br /> spread on the 7500 West Eleventh Street property and incorporated into the landscaping. If <br /> '— not, it will be loaded onto trucks and transported for disposal as a special waste at the <br /> Forward Landfill. <br /> 9.4.1.7 Restoration of Site <br /> Depending upon the quantities of clean excavated soil available, after the permeable crushed <br /> L rock has been placed in it, the remaining open volume of the cut-off trench will be backfilled, <br /> either by clean excavated soil that has been stockpiled on site, or by Caltrans Class II road <br /> base <br /> To prepare the rock backfill prior to completion of the trench backfilling, the excavator will <br /> be used to level its surface and it will then be thoroughly compacted using a pad-footed, <br /> vibratory compactor. As is shown on Figure 12, when the crushed rock backfill has been <br /> thoroughly compacted, a sheet of permeable geotextile will be laid over it so that fine soils in <br /> the final backfill will not migrate into it and reduce its permeability. <br /> The front loader will then be used to place clean or treated soil over the rock in the cut-off <br /> trench and to spread it in uniform, 6- to 8-in. high layers, each of which will be thoroughly <br /> compacted using the vibratory compactor. <br /> Note: <br /> Given the proposed location of the cut-off trench, it is expected that compaction <br /> of the backfill in the trench in the workman like manner described above will be <br /> sufficient. However, if requested by the SICDPW, a compaction curve for the <br /> final backfill material according to .procedure D1557-00 published by the <br /> American Society for Testing and Materials (ASTM) (American Society for <br /> Testing and Materials 2000b) will be generated to identify its maximum dry <br /> density and its optimum moisture content for use as backfill, Then, to ensure that <br /> a minimum relative density of 90% (or such other relative density as might be <br /> .� specified by the SJCDPW), a nuclear density gauge will be used to measure the <br /> relative density of the compacted backfill according to the procedure specified by <br /> sic <br />