My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011754
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
7500
>
3500 - Local Oversight Program
>
PR0544801
>
ARCHIVED REPORTS XR0011754
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:08 AM
Creation date
9/4/2019 11:08:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011754
RECORD_ID
PR0544801
PE
3528
FACILITY_ID
FA0003210
FACILITY_NAME
TEXACO TRUCK STOP
STREET_NUMBER
7500
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95378
APN
25015018
CURRENT_STATUS
02
SITE_LOCATION
7500 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
417
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Extended Plume Definition:4500 W 11th St., Tracy,CA. page 8 <br /> 3.4 Extended Quarterly Groundwater-quality Monitoring Program <br /> " On April 11, 2002, the scope of the groundwater-quality monitoring program at the Navarra <br /> Site was expanded to include quarterly recovery of samples from each of the 15 monitoring <br /> wells extant on the site at that time (The San Joaquin Company 2002c). The records of <br /> groundwater elevations in, and the concentrations of analytes of concern in samples of <br /> groundwater recovered from them, are also included in Tables 3 and 4. <br /> Note: <br /> According to the quarterly schedule for groundwater-quality monitoring using wells <br /> MW-1 - MW-7 that was initiated in May 2000 following completion of the first <br /> phase of site characterization at the Navarra Site, a round of monitoring would have <br /> been due in late March 2002.However,to avoid unnecessary expenditure of USTCF <br /> +� grant funds, SJC's engineer delayed implementation of that quarterly round for two <br /> weeks, until April 11, 2002, so that the complete array of 15 monitoring wells that <br /> had been completed by that time could be included in the sampling program. <br /> 3.5 Annual, Semi-annual and Quarterly Groundwater-quality Monitoring Program <br /> �-- Quarterly groundwater-quality monitoring with recovery of samples from all 15 wells then <br /> present at the Navarra site continued until July 2003 when, in compliance with guidance <br /> } provided by the SJCEHD (San Joaquin County Environmental Health Division 2003), a <br /> i-- schedule for annual, semi-annual and quarterly groundwater-quality monitoring for different <br /> well sets went into effect. <br /> Detailed results of the site characterization and groundwater-quality monitoring programs <br /> that have been completed to date have been presented in a series of engineering reports <br /> prepared by SJC (The San Joaquin Company 2004, 2003b, 2003c, 2003d, 2003e, 2002a <br /> 2002b, 2002c, 2002d, 20014, 2001 e, 2001f, 2001g,). The April 2004 sampling round is <br /> detailed in Section 4.10 below. <br /> After installation of seven additional groundwater-quality wells in April 2004 as part of the <br /> additional site characterization work that is documented in this report, the currently adopted <br /> program of groundwater-quality monitoring is again based on a quarterly schedule with <br /> groundwater samples being recovered from each of the 22 extant groundwater-quality <br /> monitoring wells on the site. <br /> Nosoorr <br /> SJC <br />
The URL can be used to link to this page
Your browser does not support the video tag.