Laserfiche WebLink
Extended Plume Definition:-7500 W 11th 3t.,Tracy, Cit. Page 31 <br /> f <br /> 10.0 SCHEDULED GROUNDWATER MONITORING ROUNDS <br /> As currently scheduled, the next round of groundwater-quality monitoring will be conducted <br /> in late July 2004, at which time, the thickness of LNAPL, if any, in the array of floating <br /> product monitoring wells will also be measured. At that time, a second round of water- <br /> quality testing will also be conducted for each of the potable water supply wells cited in <br /> Section 6.0. <br /> sic <br />