Laserfiche WebLink
March 24, 2003 <br /> To: <br /> Environmental Health Department <br /> Attention: Mike Huggins <br /> Re: Lot line Adjustment Application No. PA-03--23 of Robert Bowen (c/o Monte <br /> Seibel) (APN 005-110-01; 26821 N. Cherokee Lane, Galt, CA 95532) <br /> Regarding the letter dated February 10, 2003 from the Environmental Health { <br /> Department to SJC Community Development: <br /> B. The seal at the air vent has been sealed as required. <br /> C. This is not a well, this is a pump for surface water& has been <br /> removed. <br /> A. In regard to this item,we would like to wait until May or June (June <br /> 31' at the latest) to do the well. Because of the type of soil that is at <br /> the property my father feels that it is best to wait until there is no rain <br /> & the underlying soil has had a chance to dry out. (He is afraid that the <br /> drilling equipment - the weight of it- may damage his roadway if it is <br /> done at this time. I Lisa Hendergart, General Contractor take full <br /> responsibility to make sure the well is completed & inspected in a <br /> timely manner. <br /> Sincerely, <br /> L' Hendergart <br /> General Contractor <br /> Lic 4558843 <br /> 2808 Applewood Drive <br /> Lodi, CA 95242 <br /> 209-339-1457 <br /> 1 <br /> a. <br />