Laserfiche WebLink
i <br /> Septic Installation Instructions for m <br /> Infiltrator° Pressure Distribution Systems. SYSTE=MS INC ° <br /> -_Before You Begin... <br /> �' 1 d u�"�M..vr„ni c,� ''��Y5'r`'lll'v6�12�� �' i''�q J i` 1 P �� -'._C"7 k'o- iy7f•.��`[T gni �'��`.�,�ph��� y,` <br /> E,'�'f�'>; F�,r - x .t� I y ¢ � 4r ? t 4� €.t.--•. <br /> 1 �l� P�estarsrftpa a : ft �f l f + t .� <br /> ipr�ssture <br /> z+ r'r I b 7ti.tl \�'•�w }fN I Y f rb,,�'t' ��{���T I � 'a,. h 1 '� $ t t �'r x � '� j ��}� '"� <br /> Q 13aoKhQe]I�ylld <br /> I"+* <br /> ❑ SClearo(±IAIY 3�i <br /> ❑, Clos'ed,t rld�lat !, ~> I� rtt>tg of6v000 <br /> a 1g4w� ll-j �k•:r <br /> ❑ Hol'e1SawJFiOt1t2I��I�stAhPR, � rCIIC$ frD � 4r.rr,I a t �la � r t <br /> I.m. rI"fC. '{rl - <br /> nfdfrator� hanbptsf: �1•,131'<<T , <br /> Ali <br /> .x <br /> _ a�-e <br /> -.❑ Laser 7�rrS`t3trLerye;4, _,tsrr, r, »�''_'�' R�`i>;p"'?'+'i'+^fah•4S °` 'f'IY x.00, a[34ipp - ** 'plc'u �i4ti4-k5r'ai�t�n_5'}ino t,,, <br /> F \.. '.s- se S' - ' c�'i'�i" 'S k � Sn i• Q r ,. �.1. a,iCA.7 1 A. "a„ rf %,"� rah ijt r 'i 'S r <br /> a Pipe <br /> rcte�, - t S <br /> a'k�.uJ•Ilr�w; i�. �z �+5.:,i ��� -,.ia f.�'�r�d.y'rt :�C �'-! ".i;.� 5� +1 r� <br /> This document is designed to provide septic installation dome for improved distribution. However, the pipe may also <br /> information for Infiltrator chambers In pressure distribu- rest on the trench bottom for easy insta+lation. Call 1-800-221- <br /> tion applications. These systems may only be installed 4436 for installation information or.technical support. <br /> according to state and local regulations,if unsure of the Like conventional systems, the soil and site conditions must <br /> installation requirements for a particular site, contact be approved for installation. Be sure that a thorough site evat- <br /> your state and local regulators. uation has been conducted to determine the proper sizing <br /> In (hese instructions, the pipe is placed close to the chamber and siting of the system before proceeding with the installation <br /> Requirements for Excavating and Preparing the Site. <br /> NOTE: As is the case with conventional systems, do not <br /> -131ali the system in wet conditions or if the soil is too moist © Rake the bottom and sides if smearing has occurred <br /> ✓hick will cause machinery to smear the soil. while excavating. Remove any large stones and other <br /> debris. Do not use the teeth of the bucket to rake the trench <br /> Stake out the location of ali trenches. Set the eleva- bottom. <br /> tions of the tank, piping, and trench bottom. <br /> NOTE: Raking to eliminate smearing is not necessary in <br /> ® Install sedimentation and erosion control measures sandy soils. In fine textured soils (silts and clays), avoid <br /> ierriporary drainage swaies/berms may be installed to walking in the french to prevent compacting and lass cf <br /> protect the site during rainfall events. soil structure. <br /> EMExcavate and level the trenches with the proper sepa- © Verify that the trenches are level. <br /> ration. Remove any debris from the trench walls. <br /> Requirements for Installing the System. <br /> facing upward. If specified, drill one downward hole, at the <br /> �a <br /> end of the pipe, so the pipe wilt drain after each dosing <br /> cycle. <br /> Run the distribution pipe through the end plate Verify <br /> that the holes are facing in the correct direction. <br /> ,P,; <br /> P =yr Place the first Infiltrator chamber over the pipe. <br /> n v <br /> © Secure the end plate to the chamber by inserting the <br /> tabs on the end plate into the slots on the flange of the <br /> r1un the distribution pipe through the end plate and down the chamber. Hold the plate in place and firmly tap it until it <br /> en rte at rhe rrenrh snaps into the locked position <br /> Insert 2" screws on either side of the inlet opening on <br /> Drill the appropriately-sized hole through the end plate the chamber flange to secure the connectfon. <br /> .ging a hole saw or router bit. Closed end plates are used <br /> at both ends of the trench. 0 Secure the pressure distribution pipe to the top of the <br /> end of the chamber with a plastic pipe hanger or nylon <br /> 13 Determine the orifice diameter and spacing from the strap. This is done by sliding the strap up through one of the <br /> designed plan. Drill holes in the pressure distribution pipe holes in the top of the inlet flange, down through the other <br /> I hole, and cinching the two ends around the pipe <br /> n <br />