My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011757
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
7500
>
3500 - Local Oversight Program
>
PR0544801
>
ARCHIVED REPORTS XR0011757
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:08 AM
Creation date
9/4/2019 11:14:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011757
RECORD_ID
PR0544801
PE
3528
FACILITY_ID
FA0003210
FACILITY_NAME
TEXACO TRUCK STOP
STREET_NUMBER
7500
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95378
APN
25015018
CURRENT_STATUS
02
SITE_LOCATION
7500 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Report: Groundwater-quality Monitoring—June 23-28,2005, 7500 West Eleventh Street, Tracy, CA- Page 2 <br /> reopened for business. The restaurant <br /> `r-=- 2003, but it was restored and, by June 2004, it had <br /> y <br /> et <br /> is leased from the Navarras by Able Manzi he Casa oMendoza res aurant. In 2000,eloupe s�the <br /> t ;+ (the Mendozas) who do business <br /> as-`' Mendozas leased the rest of the site and planned to expand their business on the property. <br /> on in 1998 d on <br /> The fueling station that had been located <br /> oa the <br /> storage tanksperatiand 6,000 linear feet of <br /> December 9 of that year, eight underground <br /> associated piping were removed from the propertyones of the fuel r the permit tnanksvare1shownght of ton <br /> SJCEHD {Dietz Irrigation 1999a). The former coca <br /> Figure 2. <br /> When the tanks were removed, it was found that fuel hydrocarbons had leaked from <br /> underground piping beneath the fuel pump islands of the former fueling station. The <br /> ime <br /> former locations of the fuel pump islands are also shown oavily n Fby igure <br /> ydrocarbonshe same twas <br /> that the tanks were removed from the <br /> landsol <br /> area eand 521.25 tons of that material were <br /> excavated from beneath the pump <br /> u <br /> vIn addition, some 000 gallons <br /> of floating <br /> disposed off-site at a permitted facility. �ping from a <br /> product and affected <br /> groundwater <br /> which was used omoved om the tr transport it to a permitted recycling <br /> y p <br /> tank pit into a v <br /> facility(Dietz Irrigation 1999a). <br /> 1.3.1 Site Characterization Studies <br /> An initial site characterization investigation was completed in May 2040 that included <br /> -I throuinstallation of seven groundwater-quality m nit second g e of osite�harac erizat o�n�was <br /> :..� ( The San Joaquin Company 2041d). A Phas <br /> conducted in March and April 2002, during which eight additional groundwater-quality <br /> < MW-8 through MW-12, and MW-12A <br /> monitoring wells, numbered MW-3A, M 2042c A third phase of site characterization <br /> were installed (The San Joaquin Company ) <br /> was conducted in April 2004, during which seven additional groundwater-quality <br /> monitoring wells, numbered MW-13 through MW-19,atalledVeThe floating <br /> product <br /> monitoring wells (MWF f 22groundwater-qualitythrough <br /> and five floating product monitoring <br /> Company 2004d). A total o <br /> wells are currently extant at the site. <br /> 1.3.2 Groundwater- uali Monitonn <br /> r ' The first round of grothe Navarra Site was <br /> undwater-quality sampling and analysissat f s to characterization <br /> conducted on May 11, 2000, m association with the initial p a <br /> {The San Joaquin Company 2041 d). That sampling round used the seven wells that were <br /> initially installed on the site. Ten additional rounds of sampling and analysis were <br /> {' the <br /> f conducted between that date and July 30, n0320�3 evolving recovery oflgroundwater <br /> and October 2002, and in January andP <br /> ' k samples from all 1S wells that had been installed at the site by that time (The San Joaquin <br /> Company 2001c, 2001b, 2001a, 2002d, 2002c, 2002b, 2002a, 2003e and 2043d). The <br /> j scope of the July 2003, October 2003 and January 2004 monitoring rounds {The San <br /> sic <br />
The URL can be used to link to this page
Your browser does not support the video tag.