Laserfiche WebLink
Report:Groundwater-quality Monitoring-December 20-21, 2005, 7500 West Eleventh Street, Tracy, C.4. Page <br /> 4"" 2.0 DECEMBER 2005 GROUNDWATER-QUALITY MONITORING ROUND <br /> On December 20 and 21, 2005, SJC conducted the twentieth round of groundwater- <br /> quality monitoring at the 7500 West Eleventh Street site. <br /> The scope of groundwater sampling conducted in December 2005 was designed to <br /> incorporate both the findings from the natural attenuation studies that had been conducted <br /> on the site in March 2005 and the results of a Monitoring and Remediation Optimization <br /> System (MAROS) study, which was also conducted at that time in the manner advocated <br /> by the United States Environmental Protection Agency (US-EPA) and the California <br /> Environmental Protection Agency (Cal-EPA) (The San Joaquin Company 2006). <br /> Although the results of the MAROS and natural attenuations studies called for quarterly <br /> recovery of groundwater samples from only Monitoring Wells MW-3, MW-7 and MW- <br /> 13, SJC, to ensure an abundance of conservatism, recommended that, for a period of one <br /> year following the March 2005 sampling round, additional wells located along the long <br /> axis of the primary plume, at key locations on its western and eastern periphery and in the <br /> secondary plume of affected groundwater that is present on the site should be sampled. <br /> Accordingly, the array of wells sampled in the December 2005 monitoring round <br /> included Monitoring Wells MW-2, MW-3, MW-4, MW-5, MW-7, MW-10, MW-11, <br /> MW-12, MW-13, MW-16, MW-17, MW-18, MW-19, MWFP-1, MWFP-2, MWFP-4 <br /> L and MWFP-5 (see Figure 3 for locations). <br /> 21 Groundwater Elevations and Flow Direction <br /> ,6. <br /> To initiate the December 2005 sampling program, the depth to groundwater in each of the <br /> 27 monitoring wells was measured using a conductivity probe on December 20, 2005. <br /> The water table elevations were computed relative to mean sea level (MSL). <br /> ` The groundwater elevations presented in Table 1 were used to generate the groundwater <br /> contours shown on Figure 2. However, because, as is noted in Table 3, an apparent 0.03 <br /> ft. of floating product was detected in Monitoring Well MW-7, the groundwater elevation <br /> ` in that well was corrected for the purpose of drawing the groundwater contours to allow <br /> for the depression of the water table in the vicinity of that well by the hydrocarbon fuel <br /> products floating on the surface of the water. The correction was derived as follows: <br /> a� Assume Specific Gravity of Diesel=0.84 <br /> Assume Specific Gravity of Gasoline=0.74 <br /> For the purpose of computing the required adjustment,- it was assumed that relative <br /> proportions of diesel and gasoline in the floating product in Monitoring Well MW-7 are <br /> ;- in the same ratio as the concentrations of diesel and gasoline in the sample of <br /> groundwater recovered from that well on March 9, 2005. They were, respectively, 18,000 <br /> gg/L and 15,000 µg/L. (See Table 2.) <br /> Thus, the estimated specific gravity of the floating product in well MW-7 is: <br /> SJC <br />