Laserfiche WebLink
{� IMPACT MlT1GAT10i+1 11dON€�0RING ACTION 1�5PONS[BLE TIMING <br /> N ...... ... <br /> Possible loss of A 50-1o61 natural The Development Development Prior to <br /> riparian habitat. setback buffer shall Services division will Services Division recordation of <br /> be established along review the Final Map and the the Final Map <br /> each side of the and CC&Rs before Department of Fish and at the time <br /> creek. _ recordation. and Game and the of building <br /> A 100400t natural Building' permit <br /> setback buffer shall Building and grading Department. approval. <br /> be established around permits will be checked <br /> the pond.` _ against the Final Map. <br /> The above buffers <br /> v <br /> Y shall be mapped on <br /> the Final Map and <br /> Included In the <br /> CC&R's. <br /> Loss of Vernal The vernal pools in The Development Development Prior to <br /> Pools and Wetlands. lots 7,11,13 and 16 Services division will Services Division recordation of <br /> and a 50-foot buffer review the Final Map and the the Final Map <br /> around them shall be and CC&Rs before Department of Fish and at the time <br /> designated as"Open recordation. and Game and the -of building s <br /> Space'and protected. Building permit <br /> The buffer shall be Building and grading Department. approval <br /> { ' mapped on the Final permits wffl be checked <br /> Map and Included In against the Final Map. <br /> the CC&R's. <br /> - F <br /> 1, <br /> 4 <br /> Initial Study (Rev: 01/91) <br /> 12 <br />