Laserfiche WebLink
YES NO <br /> Other sources used: <br /> 7. Hazards: ` <br /> a. Will the project create a risk of <br /> explosion; release, generate or <br /> store any hazardous substances; or <br /> cause other dangers to public health <br /> and safety? , X <br /> n <br /> b. Are there any known, hazardous - <br /> substances located within 500 feet of <br /> k the boundaries of this project, if in <br /> an existing or proposed residential <br /> area (this could include possible <br /> r groundwater contamination) ? _ X <br /> c. Will the project^result in <br /> interference with, or need for, <br /> emergency plans? X <br /> Other sources used: <br /> a <br /> a. Utilities and Public service: <br /> ** a. .,Will the projectrequire alteration of, <br /> addition to, or the need for new utility <br /> systems (water, sewer, drainage, solid <br /> waste)., . including a Sphere of Influence <br /> or district boundary change? X <br /> ** b. Will the project result in the <br /> need for or the expansion of the <br /> following services: fire and police - <br /> protection, schools, parks and <br /> recreation, libraries, roads, flood <br /> control, solid waste or other public <br /> works facilities, public transit, or <br /> governmental services? X <br /> C. Will the project adversely impact <br /> existing recreational/park <br /> opportunities or require new <br /> park/recreation opportunities? X <br /> Note: ** "Yes" answers to these two questions and 9 (b) below <br /> I will require additional discussion, but do not necessarily <br /> F indicate a potentially significant impact. <br /> ` t Initial Study (Rev:01/91) <br /> 5 <br />