Laserfiche WebLink
Ili <br /> YES NO <br /> Other sources used <br /> 7. Hazards: , <br /> y <br /> a. Will the project create a risk of <br /> explosion; release, generate or <br /> store any hazardous substances; or <br /> cause other dangers to public health <br /> and safet�y? X <br /> b. Are there any known hazardous <br /> substances located within 500 feet of <br /> the boundaries of this project, if in <br /> an existing or proposed residential <br /> area (this could include possible i <br /> groundwater contamination) ? X <br /> c. Will theilproject "result in <br /> interference with, or need for, <br /> emergency plans? X <br /> Other sources used: <br /> 'i <br /> 8. Utilities and Public Service: <br /> ** a. . Will the �project. require alteration of, <br /> additionO.to, or the need for new utility <br /> systems (water, sewer, drainage, solid <br /> waste)., - including a Sphere of Influence <br /> or district boundary change? X <br /> ** b. Will thellproject result in the <br /> need for or the expansion of the <br /> following services: fire �and police <br /> protection, schools, parks and <br /> recreation, libraries, roads, flood <br /> control, !Esolid waste or other public <br /> works facilities, public transit, or <br /> governmental services? X <br /> C. Will the'1.project adversely impact+ <br /> existing,�.recreational/park <br /> opportunities or` require new <br /> park/recreation opportunities? X <br /> u i <br /> Note: ** "Yes" answers to these two questions and 9 (b) below <br /> will require additional discussion, but do not necessarily i <br /> indicate a` potentially significant impact. <br /> it <br /> II <br /> 'Initial Study (Rev:01/91) <br /> 5 <br /> I <br /> A <br />